Laserfiche WebLink
CC Regular Session <br />Meeting Date: 10/26/2021 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />5. 15. <br />Title: <br />Adopt Resolution #21-301 Ordering Plans and Specifications for Improvement Project #22-03, 2022 MSA <br />Pavement Overlay Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-301 Ordering Plans and Specifications for Improvement Project <br />#22-03, 2022 MSA Pavement Overlay Improvements. <br />Background: <br />Overlaying the MSA streets identified within the 2021 — 2030 Capital Improvement Program for 2022 will allow <br />the City to maintain these streets in the most cost-effective manner throughout the serviceable life of the streets. <br />The street segment proposed to receive bituminous pavement overlay improvements in 2022 is Riverdale Drive <br />between the Armstrong Boulevard Interchange and Llama Street. <br />A street segment summary is attached, the proposed project is 0.24 miles in total length. It should be noted that the <br />western project limit is anticipated to shift east of Llama Street to accommodate the proposed Riverdale Drive <br />extension to Bowers Street, which is currently proposed to be constructed in 2022. <br />City sewer and water utilities exist in the project area, no repairs are proposed with this project. However, the <br />utilities are proposed to be extended to the west as part of the Riverdale Drive extension project. Minor storm sewer <br />improvements, generally including re -grouting of the catch basins, is proposed with this project. <br />Estimated project costs per the proposed 2022 — 2031 CIP are $69,000. Estimated costs include 23-percent indirect <br />costs for administrative, engineering, finance and legal costs. Staff proposes to create the plans and specifications <br />in-house as part of their normal duties. <br />The proposed improvements are designated as City Improvement Project #22-03, 2022 MSA Pavement Overlay <br />Improvements <br />Notification: <br />No notifications are required with this case. <br />Time Frame/Observations/Alternatives: <br />Motion to adopt Resolution #21-301 ordering plans and specifications for improvement project #22-03, 2022 MSA <br />Pavement Overlay Improvements. <br />Funding Source: <br />