Laserfiche WebLink
CC Regular Session <br />Meeting Date: 10/26/2021 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />5. 16. <br />Title: <br />Adopt Resolution #21-306 Ordering Plans and Specifications for Improvement Project #22-04, 2022 Neighborhood <br />Pavement Overlay Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution 21-306 Ordering Plans and Specifications for Improvement Project <br />#22-04, 2022 Neighborhood Pavement Overlay Improvements. <br />Background: <br />City Improvement Project 21-12, 2021 Additional Pavement Overlay Improvements took advantage of a favorable <br />bidding environment, allowing the City to overlay 2.58 miles of City streets in 2021 which were identified as 2022 <br />overlay improvements within the current 2021 — 2030 Capital Improvement Program (CIP). Additionally, the <br />design of the new water treatment facility will have impacts to additional street segments near Jaspar and 143rd <br />Avenue. The proposed 2022 — 2031 Capital Improvement Program has adjusted to these impacts. <br />The attached Proposed 2022 Pavement Management Program Projects Map shows the specific neighborhood street <br />segments proposed to receive bituminous pavement overlay improvements in 2022. These street segments are <br />located in the following developments: <br />• Sunfish Lake Business Park 2nd <br />• Sunflower Ridge <br />• Tiger Meadows <br />• The Ponds of Ramsey <br />A street segment summary is attached. The proposed project is 2.69 miles in total length. <br />City sewer and water utilities exist within all of the subdivisions except Tiger Meadows. No repairs are proposed <br />with this project. Minor storm sewer improvements, generally including re -grouting the catch basins, is proposed <br />with this project. <br />Spot concrete curb and gutter repairs, as well as ADA compliant pedestrian ramp improvements, are proposed with <br />this project. Pedestrian ramp improvements will occur within the Sunflower Ridge and The Ponds of Ramsey <br />subdivisions. <br />Estimated project costs per the proposed 2022 — 2031 CIP are $624,000. Estimated costs include 23-percent <br />indirect costs for administrative, engineering, finance and legal costs. Staff proposes to create the plans and <br />specifications in-house as part of their normal duties. <br />The proposed improvements are designated as City Improvement Project #22-04, 2022 Neighborhood Pavement <br />Overlay Improvements. <br />Notification: <br />