Laserfiche WebLink
performed. Minimal impacts to private driveways and lawns is expected, though any impacts would be within the <br />City -owned right of way. <br />City Staff is aware of more severe curb and gutter damage within the Junkite Street cul-de-sac, south of 145th <br />Court, due to failing slopes behind the curb and will determine the most appropriate treatment during project design. <br />Municipal utilities exist in the project area including water, sewer, and storm sewer systems. The watermain was <br />leak tested, and no leaks were discovered. The sanitary and storm sewer was cleaned and televised. No repairs to <br />the sanitary or storm sewer pipes are anticipated with this project, however further review of the televising needs to <br />be performed before this can be confirmed. Any required repairs discovered from the review of the sewer are not <br />included in the current estimated cost. <br />Estimated project costs per the proposed 2022 — 2031 CIP are $550,000. Estimated costs include 23-percent <br />indirect costs for administrative, engineering, finance and legal costs. Staff proposes to create the plans and <br />specifications in-house as part of their normal duties. <br />The street improvement proposed with this project are identified as a 2026 project in the City's current 10-year CIP, <br />and as a 2022 project within the proposed 2022 — 2031 CIP, and can be funded using a combination of Pavement <br />Management Funds and Storm Water Utility Funds. If repairs are required to be made to the sanitary sewer those <br />improvements can be funded using the Sewer Utility Funds, though they are not proposed within the current <br />estimate. This project would best be constructed as a stand-alone project and is necessary, feasible, and <br />cost-effective from an engineering standpoint, and can be constructed as proposed herein. <br />The proposed improvements are designated as City Improvement Project #22-06, Wood Pond Hills 2nd — 5th Street <br />Reconstructions. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Motion to adopt Resolution #21-307 Ordering Plans and Specifications for Improvement Project #22-06, Wood <br />Pond Hills 2nd — 5th Street Reconstructions. <br />Funding Source: <br />Funding for this improvement is proposed to come from the Pavement Management Fund and Stormwater Utility <br />Fund. <br />• (PMP) Street Project Cost $500,000 <br />• Storm Sewer Project Cost $50,000 <br />• Total Estimated Project Cost $550,000 <br />Recommendation: <br />Staff recommends adopting Resolution #21-307 Ordering Plans and Specifications for Improvement Project <br />#22-06, Wood Pond Hills 2nd — 5th Street Reconstructions. <br />The Ramsey Public Works Committee reviewed this project on October 19, 2021. The committee recommended <br />City Council authorization ordering Staff to prepare plans and specifications. <br />Outcome/Action: <br />Adopt Resolution #21-307 Ordering Plans and Specifications for Improvement Project #22-06, Wood Pond Hills <br />2nd — 5th Street Reconstructions. <br />