My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 10/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:39 PM
Creation date
1/11/2022 3:29:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br />1.1 Project Description <br />The City of Ramsey (City) is preparing to complete roadway improvement projects within 3 <br />general areas of the City during the 2022 construction season. These areas included; the Sunwood <br />Drive and Waco Street Area, the Autumn Heights Area and the Wood Pond Hills 2nd - 5th Area. <br />To aid in preparing design and construction documents the City solicited bids to perform a <br />geotechnical exploration within each of the 3 areas. <br />Haugo GeoTechnical Services (HGTS), was the successful bidder for the 3 projects. This report <br />presents the results of 13 soil borings advanced along the various roadway alignments within the <br />Wood Pond Hills 2nd - 5th area. <br />1.2 Purpose <br />The purpose of this geotechnical exploration was to determine existing bituminous pavement <br />section thicknesses, characterize subsurface soil and groundwater conditions and provide <br />recommendations for roadway design and construction. <br />1.3 Site Description <br />The streets with the Wood Pond Hills 2nd - 5th area (Wood Pond Hills) are located on the west side <br />of Nowthen Boulevard NW (aka County Road 5) and generally located between Sunwood Drive <br />NW and Iodine Street NW. The streets slated for improvements include; Krypton Court, Iodine <br />Court, Junkite Street, 146th Circle, 145th Court, Helium Court, Iodine Street and 145th Circle. Each <br />street is a 2-lane bituminous surfaced residential roadway that provides access to single family <br />homes. The roadways were estimated to be about 30 feet wide and included concrete curb & <br />gutter. Each of the streets slated for improvement was noted to contain numerous cracks, both <br />longitudinal and transverse cracks as well as some "alligator" cracking. We also observed <br />multiple patched areas. <br />1.4 Scope of Services <br />Our scope of services was performed in accordance with the City of Ramey REQUEST FOR <br />PROPOSAL, PAVEMENT MANAGEMENT PROGRAM, 2022 PROJECTS issued on July 20, 2021. <br />Our scope of service for the Wood Pond Hill project included the following tasks: <br />• Performing 13 standard penetration test borings each to a nominal depth of 10 feet. <br />• Coring the pavement at 13 locations to measure the thickness of the existing bituminous <br />and aggregate base. <br />• Visually/manually classifying samples recovered from the soil borings. <br />• Performing laboratory tests on selected samples. <br />• Preparing soil boring logs describing the materials encountered and the results of <br />groundwater level measurements. <br />• Preparing an engineering report describing soil and groundwater conditions and <br />providing recommendations for roadway construction/reconstruction. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.