My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 10/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:39 PM
Creation date
1/11/2022 3:29:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7, 4, <br />Meeting Date: 10/26/2021 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #21-305 Ordering Plans and Specifications for Improvement Project #22-05, Riverdale Drive <br />Trunk Utility Improvements, Llama Street to Bowers Drive <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-305 ordering Plans and Specifications for Improvement Project <br />#22-05, Riverdale Drive Trunk Utility Improvements, Llama Street to Bowers Drive. <br />Background: <br />The case is need to prevent the long plan review schedule required for Improvement Project #20-05, Riverdale <br />Drive Extension, Llama Street to Bowers Drive, as outlined in the previous case, from unnecessarily delaying <br />construction of the proposed Riverstone South residential development. <br />Since LPP funds are being utilized as source of funding for Improvement Project #20-05, MnDOT requires a <br />significantly more complex plan review process that will extend the anticipated plan approval schedule for that <br />project to the summer of 2022, meaning construction of those improvements may not occur until late summer or <br />fall of 2022. <br />To better facilitate the proposed construction schedule for Riverstone South, the trunk utilities work (Improvement <br />Project #22-05) is being pulled out of Improvement Project #20-05, which will prevent the trunk utility plans from <br />needing to run through the same MnDOT LPP plan review process, thereby allowing this work to be bid this winter <br />and constructed next spring/early summer. <br />This work is expected to take up to 8 weeks to construct, including the lift station within the Riverstone South plat. <br />Staff will work to properly coordinate this trunk utility work with the developers private utilities work. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The extension of Riverdale Drive between Llama Street and Bowers Drive is needed to support future development <br />in this area. Capstone Homes currently proposes to begin construction in 2022 on the first phase of Riverstone <br />South, a 244-unit residential development east of Bowers Drive and south of U.S. Highway 10/169. <br />Commercial development is also proposed in the area between U.S. Highway 10/169 and the proposed extension of <br />Riverdale Drive. These developers will pay into the trunk utility fund at the time they develop, helping to replenish <br />the enterprise funds. <br />Alternatives: <br />Alternative #1: <br />Motion to adopt Resolution #21-305 ordering Plans and Specifications for Improvement Project #22-05, Riverdale <br />Drive Trunk Utility Improvements, Llama Street to Bowers Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.