My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 10/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:39 PM
Creation date
1/11/2022 3:29:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7, 6, <br />Meeting Date: 10/26/2021 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #21-303 Approving Plans and Specifications and Authorizing Advertisements for Bids for <br />Improvement Project #21-08, Water Treatment Plant Trunk Watermain Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-303 approving Plans and Specifications and authorizing <br />advertisements for bids for Improvement Project #21-08, Water Treatment Plant Trunk Watermain Improvements. <br />Background: <br />On March 9, 2021, the Ramsey City Council adopted Resolution #21-061 awarding a contract to SEH Inc. to <br />prepare plans and specifications for Improvement Project #21-08, Water Treatment Plant Trunk Watermain <br />Improvements. A copy of this resolution is attached. <br />Plans were recently completed and are ready to be advertised for bids. Plans were prepared with a base bid and an <br />alternate bid as follows; <br />• Base bid — The base bid specifies a combination of construction techniques whereby open trenching of <br />watermain is specified along the south side of Bunker Lake Boulevard and the north side of 143rd Avenue, <br />while directional drilling of watermain is specified at intersections, through Cottonwood Park, under <br />Sunwood Drive, and under the stormwater pond between Hoya and Anderson Dahlen north of 143rd Avenue. <br />• Alternate bid — The alternate bid specifies directional drilling of watermain across as much of the project area <br />as feasible. <br />Copies of the title sheet and the general layout are attached for reference. Staff will have a full set of plans available <br />at the meeting to address any specific design questions Council may have. As has been stated in similar previous <br />cases, Staff recommends not attaching final plans to Council cases to prevent bidders from using those plans to bid <br />the project, which can result in bids that do not reflect plan addendums. <br />Notification: <br />Bids will be advertised in Finance and Commerce and in the Anoka Union Herald on Friday, October 29, 2021, and <br />on November 5, 2021. Bids will also be advertised and managed online on QuestCDN. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The current bidding environment for utility pipes is extremely volatile. There is currently an overall shortage of pipe <br />and appurtenant materials for various material types. This is due to a shortage of materials caused by supply chain <br />disruptions due to recent extreme weather events, a shortage of drivers, shipping lane blockages, etc. All this is <br />resulting in increased pipe costs and long delivery times between the time materials are ordered and the time they <br />are delivered. On average, pipes are not able to be delivered for 3 to 6 months or more from the time they are <br />ordered. Staff therefore recommends bidding this project as soon as possible, allowing an extended bidding window <br />(Staff recommends 2 months), and allowing bidders as much time as possible to substantially complete the work <br />(Staff recommends a substantial completion deadline of May 2023 to ensure the trunk watermain is in place and <br />operational by the time the new Water Treatment Facility is operational in the fall of 2023). All this should allow <br />
The URL can be used to link to this page
Your browser does not support the video tag.