My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 10/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:39 PM
Creation date
1/11/2022 3:29:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember introduced the following resolution and moved for its adoption: <br />RESOLUTION #21-293 <br />RESOLUTION AUTHORIZING PARTIAL PAYMENT NO. 2 TO NORTH VALLEY, INC., FOR <br />IMPROVEMENT PROJECT #21-02, TIGER STREET RECONSTRUCTION <br />WHEREAS, the City of Ramsey proposes to reconstruct Tiger Street between Armstrong <br />Boulevard and 173rd Avenue in 2021 as identified in the 2021-2030 Capital Improvement Program; and <br />WHEREAS, pursuant to Ramsey City Council resolution #20-259, adopted November 10, 2020, the City <br />Council accepted the quotes of Bolton & Menk, Inc. to provide topographic survey services, and Chosen <br />Valley Testing for the geotechnical evaluation services required to design and prepare plans and <br />specifications for said improvements; and <br />WHEREAS, City Staff has received the topographic survey and geotechnical evaluations and has <br />the capacity to prepare plans and specifications for improvement project #21-02, Tiger Street <br />Reconstruction; and <br />WHEREAS, pursuant to Ramsey City Council resolution #21-009, adopted January 12, 2021, the <br />City Engineer has prepared plans and specifications for the purpose of advertising for bids for the same <br />improvements; and <br />WHEREAS, pursuant to Ramsey City Council resolution #21-085, adopted April 13, 2021, the <br />City Council approved final plans and specifications as prepared by the City Engineer and authorized <br />advertisement for bids for said improvements; and <br />WHEREAS, pursuant to Ramsey City Council resolution #21-139, adopted May 25, 2021, the bid <br />of North Valley, Inc., of Nowthen, Minnesota, in the amount of $224,552.19, for the construction of said <br />improvements was accepted; the Mayor and City Administrator were authorized and directed to enter into <br />a contract with said bidder for the construction of said improvements for and on behalf of the City of <br />Ramsey, and the City Administrator was hereby authorized to execute the proposal from Bolton & Menk, <br />Inc. to provide construction staking services for said improvements in a total not -to -exceed amount of <br />$4,680 for the project; and <br />WHEREAS, pursuant to Ramsey City Council Resolution #21-246 adopted Change Order No.1 <br />in the amount of $50,638.69 allowing the removal of 1,093 cubic yards of unsuitable materials from the <br />road core which were discovered during construction and placement of 1,093 cubic yards of select <br />granular material. The quantities of which were significantly greater than the approved plans and <br />specifications accounted for; and <br />WHEREAS, as of October 26, 2021 $214,486.53 has been paid to date; and <br />WHEREAS, the Engineer Technician IV has inspected the completed work and recommends <br />partial payment No. 2 to North Valley, Inc. of Nowthen, Minnesota for Improvement Project #21-02, <br />Tiger Street Reconstruction, in the amount of $25,196.61. <br />
The URL can be used to link to this page
Your browser does not support the video tag.