Laserfiche WebLink
M <br />N <br />Capital Improvement Program <br />City of Ramsey, Minnesota <br />E <br />0 <br />0 <br />5 <br />rao <br />O <br />N <br />H <br />19-SEW-003 <br />Useful Life <br />Sewer Utility Improvement <br />1-Existing Obligation (High) <br />Total Cost <br />Description <br />0 <br />N <br />z <br />a) <br />c0 <br />• <br />0 <br />0 <br />O <br />U <br />0 <br />N <br />Justification <br />Replace both pumps and base elbows due to normal wear by 2023. Both pumps will need to be replaced to assure proper pumping and reliability. <br />H <br />a1 <br />O <br />N <br />00 <br />N <br />N <br />N <br />N <br />N <br />N <br />Expenditures <br />co <br />O <br />0 <br />c <br />N O <br />E0 <br />a) 01 <br />0_= <br />_m <br />LC) <br />M <br />Co) <br />O <br />H <br />O <br />H <br />00 <br />N <br />N <br />O <br />N <br />Funding Sources <br />0 <br />0 <br />10 <br />M <br />0 <br />0 <br />10 <br />M <br />Sewer Utility Fund <br />Sri <br />M <br />