Laserfiche WebLink
• <br />N <br />0 <br />N <br />.o <br />o <br />Greater $45 or 1.5°r <br />0 <br />r <br />0 <br />r <br />0 8 <br />130.00 <br />o 8 <br />o <br />o <br />0 <br />0 8 <br />kr, o <br />2021 Coon <br />Rapids <br />65% of Bldg. Permit <br />Fee <br />O <br />49.00/77.00/154.00 <br />150.00-250.00 <br />O <br />O <br />O <br />N <br />O <br />O <br />l--1 <br />257.00 <br />103.00 <br />O <br />4' <br />2021 <br />Champlin <br />65% of Bldg. Permit <br />Fee <br />100.00 <br />100.00 <br />C <br />0 <br />100.00 <br />J <br />O -O <br />c.O <br />, O <br />O <br />N <br />C <br />O <br />C <br />00 <br />J <br />O -O <br />C 4" <br />O <br />0 <br />O <br />N <br />2021 <br />Anoka <br />O <br />2N <br />V <br />O <br />O <br />g O <br />O , <br />4 <br />O <br />VOi <br />O <br />kl <br />O <br />O, <br />O <br />N <br />2000.00 <br />2021 Andover <br />$90 pr fixture or <br />1.5%ofJob <br />Valuation Greater <br />of <br />$90 pr fixture or <br />1.5% of Job <br />Valuation Greater <br />of <br />65% of Bldg. <br />Permit Fee <br />C <br />C <br />O <br />N <br />175.00 <br />$90 or $15 per <br />fixture greater of <br />C O <br />O O <br />Vl O <br />01 <br />O <br />O <br />O <br />O� <br />90.00 <br />250.00 <br />250.00 <br />20.00 <br />C <br />O <br />O <br />O\ <br />O <br />C <br />0 <br />a1 <br />O O <br />O C <br />0 0 <br />,O �D <br />4983/acre <br />O <br />O <br />O <br />,O <br />O <br />C <br />O <br />01 <br />2022 Proposed j <br />ry <br />O <br />N <br />.. <br />65% of Bldg Permit fee <br />(Non -Refundable) <br />105.00 <br />105.00 <br />O O <br />O <br />O <br />150.00 <br />100.00 <br />O <br />, <br />�y <br />125.00 <br />Min $500.00/Max $1,500.00 <br />80.00 per trip <br />105.00 <br />Ramsey Valuation Fee Schedule <br />105.00 <br />105.00 <br />175.00 <br />250.00 <br />175.00 <br />2,485.00 <br />15.00 <br />25.00 <br />of Job Value/Minimum 258.00 <br />O O <br />O ,--I <br />oo <br />O <br />O <br />O O <br />O O <br />in In <br />1,434.00 <br />O <br />O <br />kn <br />50.00 <br />of Job Value/Minimum 258.00 <br />2021 Adopted (These rates been in place <br />since 2019) <br />O <br />`,--i <br />O <br />50% of Bldg Permit fee (Non - <br />Refundable) <br />O O <br />p O <br />p 0 <br />, Vi <br />O O <br />O O <br />0 0 <br />. Vi <br />100.00 <br />100.00 <br />Op <br />N <br />Op p <br />p <br />2 Vi <br />b~,9 <br />YC <br />O <br />O <br />80.00 per trip <br />75.00 <br />City of Ramsey Valuation Fee Schedule <br />75.00 <br />O O <br />O O <br />tf1 <br />r ev <br />250.00 <br />125.00 <br />2,485.00 <br />15.00 <br />25.00 <br />2% of Job Value/Minimum 258.00 <br />O O <br />O O <br />O'4 <br />V� <br />O <br />O <br />O <br />O <br />O O <br />O O <br />O O <br />V) V� <br />O <br />O <br />g <br />M <br />.-- <br />O <br />O <br />O <br />Vi <br />25.00 <br />2% of Job Value/Minimum 258.00 <br />2018 Adopted <br />1% of job value/minimum 206.00 <br />1% of job value/minimum 103.00 <br />65% of Bldg Permit fee (Non - <br />Refundable) <br />105.00 <br />105.00 <br />O O <br />M 1 <br />l!i �O <br />206.00 <br />105.00 <br />1% of job value/minimum 309.00 <br />1% of job value/minimum 155.00 <br />Min $500.00/Max $1,500.00 <br />53.00 per trip <br />105.00 <br />City of Ramsey Valuation Fee Schedule <br />105.00 <br />105.00 <br />155.00 <br />258.00 <br />155.00 <br />2,485.00 <br />21.00 <br />77.00 <br />2% of Job Value/Minimum 258.00 <br />O O <br />M 4g';M <br />0 <br />0 0 <br />�D <br />V7 I <br />O <br />gM <br />N <br />.--I <br />O <br />Vi <br />77.00 <br />2% of Job Value/Minimum 258.00 <br />SERVICE OR LICENSE <br />Plumbing permit-Residential/Single Family -New Construction <br />Plumbing permit-Residential/Single Family- <br />Remodel/Addition <br />Re-Roofing/Shingling Permit-Commercial/Multi-Family <br />Re -Siding Permit <br />wind <br />Septic system permit -commercial <br />Septic Tank Installation Permit -Residential <br />Service Availability Charge (SAC) <br />Septic Tank Pumping Permit <br />Sewer permit (Utility Connection) -Residential <br />Sewer permit (Utility Connection) -Commercial <br />Site Evaluation Fee <br />State Surcharge <br />Swimming pool permit <br />Water Availability Charge (WAC) - per address <br />Water Softener Permit -Residential <br />Water permit (Utility Connection) -Residential <br />Water permit (Utility Connection) -Commercial <br />