Laserfiche WebLink
Street Improvements <br />E <br />o <br />19-STR-016 <br />Street Improvement <br />wo <br />cs <br />3-Existing Obligation (Med) <br />g <br />N <br />• <br />N <br />71- <br />"1. <br />Total Cost <br />178th Avenue, 178th Circle and Vicuna Street <br />O <br />0 <br />• <br />• <br />a) <br />a) <br />0 ,o <br />O <br />• <br />ria • <br />Justification <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be applied. <br />O <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />O <br />Expenditures <br />ti <br />M <br />LO <br />czi <br />0 <br />O <br />E0 <br />a) 0) <br />= <br />m <br />ti <br />M <br />N <br />N <br />N <br />N <br />N <br />N <br />O <br />Funding Sources <br />0) LO <br />CO 00 <br />CO <br />0 <br />0) <br />Storm Water Utility Fund <br />ti <br />M <br />