Laserfiche WebLink
Public Works Superintendent Riemer provided an update on the water treatment plant process. <br />Chairperson Riley asked when the City would be looking at the road overlays proposed for 2022. <br />City Engineer Westby stated that staff is working on those preparations in order to tee up the <br />proposed projects. He noted that cases will go before the City Council in the near future, assuming <br />there would be funding. He stated that staff is also working on the updated CIP to bring before <br />the Council and advised that those actions would come forward in similar timing. <br />Chairperson Riley stated that the CIP is smart and provided the best information at that time but <br />also recognized that some streets have deteriorated faster than others and may need to move <br />forward in a faster schedule. <br />City Engineer Westby asked if the Public Works Committee would like to review the draft CIP <br />before the Council considered approving it. <br />Chairperson Riley stated that he did not see that as necessary and noted that staff has the <br />information in order to make the best decision on the order of road repairs. He asked if the website <br />tool showing when streets will be repaired will be updated when the CIP is updated. <br />City Engineer Westby confirmed that tool would be updated once the CIP is updated and adopted. <br />Chairperson Riley suggested that tool be placed in a more prominent location on the website. <br />City Engineer Westby provided an update on current and proposed County and MnDOT <br />improvement projects and studies, and other items of interest. <br />Councilmember Musgrove stated that she would like to add a sound wall to the list of studies at <br />the corner of Hwy 47 and CR 5. She stated that the residents in that area do not feel that the <br />existing sound wall is helpful and did not meet the intent. <br />Chairperson Riley clarified that Councilmember Musgrove is stating that the wall was put in, but <br />it is inadequate. <br />City Engineer Westby provided background information noting that the wall was constructed as <br />proposed within the approved plans. <br />6.02: Review Future Topics Calendar <br />Chairperson Riley referenced the first item, Sunfish Lake sedimentation basin, which has been on <br />the list for about the past six years. <br />City Engineer Westby stated that the intent was to get that going this year but there has not been <br />contact from that resident and that was pushed down as there is not a great sense of urgency as <br />compared to other items staff are working on. He noted that wetland mitigation would be required <br />and therefore staff wanted to present costs to determine whether it would be a worthwhile project. <br />Public Works Committee / September 21, 2021 <br />Page 5 of 6 <br />