My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 11/23/2021
Ramsey
>
Public
>
Minutes
>
Council
>
2021
>
Minutes - Council - 11/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:12:49 AM
Creation date
1/12/2022 11:17:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
11/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7. COUNCIL BUSINESS <br />7.01: Adopt Resolution #21-334 Approving the Restoration of the 25-Year-Old Lake Itasca <br />Boardwalk <br /> <br />Parks and Assistant Public Works Superintendent Riverblood presented the resolution and gave a <br />background on park maintenance and infrastructure. He stated around 2006 the City established a <br />park maintenance fund recognizing that certain parts of the park’s infrastructure would need <br />maintenance and replacement. He highlighted several parks that have had maintenance <br />improvements paid by the Parks Maintenance Fund. The boardwalk included in this case is <br />considered at the end of its useful life. It is one of the most popular of the park improvements. It <br />is proposed that the width of the boardwalk would go from six feet to eight feet. The not-to-exceed <br />amount is $138,000. Minnesota Boardwalks LLC submitted the lowest bid for the work. If <br />approved, construction could begin in mid-to-late December with completion sometime during the <br />winter. <br /> <br />Mayor Kuzma referenced the bridge going over Trout Brook Creek and asked if the frequent <br />flooding occurring there is going to be addressed. <br /> <br />Parks and Assistant Public Works Superintendent Riverblood replied that the bridge was replaced <br />three or four years ago. It was elevated above the high-water mark and the supports were <br />reconfigured so it is less likely to capture brush and have water loading on it. He stated the new <br />over decking will match that bridge. <br /> <br />Councilmember Musgrove asked for confirmation that the funding for this park is coming from <br />the Parks Maintenance Fund. <br /> <br />Parks and Assistant Public Works Superintendent Riverblood confirmed this, noting it was <br />renamed a couple of years ago by the City Council to be the Capital Maintenance Fund. <br /> <br />Councilmember Musgrove commented that part of what she likes about this case is that the <br />residents can see that the City is working on the existing parks. She noted that from the pictures <br />presented tonight, the current boardwalk doesn’t look safe. She asked when the project would be <br />done. <br /> <br />Parks and Assistant Public Works Superintendent Riverblood replied the RFP was issued, giving <br />the construction company a window for construction from award of the project by the City Council <br />until April 30, 2022. The projected start time is mid-December with a construction time of a few <br />weeks, dependent on the weather. He noted a stipulation of the project is that the boardwalk would <br />be available to the public the entire time. <br /> <br />Motion by Councilmember Musgrove, seconded by Councilmember Howell to, adopt Resolution <br />#21-334, Awarding Lake Itasca Boardwalk restoration to Minnesota Boardwalk LLC, at the not- <br />to-exceed amount of $138,000. <br /> <br />City Council / November 23, 2021 <br />Page 6 of 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.