Laserfiche WebLink
Public Works Committee 5. 6. <br />Meeting Date: 01 / 18/2022 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommendation for City Council to Reject Bids for Water Treatment Plant Trunk Watermain <br />Improvements, Improvement Project #21-08 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider a recommendation for the City Council to reject bids for the Water <br />Treatment Plant Trunk Watermain Improvements, Improvement Project #21-08. <br />Background: <br />On March 9, 2021, the Ramsey City Council adopted Resolution #21-061 awarding a contract to SEH Inc. to <br />prepare plans and specifications for Improvement Project #21-08, Water Treatment Plant Trunk Watermain <br />Improvements. A copy of this resolution is attached. <br />Plans were prepared with a base bid and an alternate bid. <br />• Base bid — Specifies a combination of construction methods whereby open trenching of plastic (PVC) <br />watermain is specified along the south side of Bunker Lake Boulevard and the north side of 143rd Avenue, <br />while directional drilling of plastic (PVC) watermain is specified at intersections, through Cottonwood Park, <br />under Sunwood Drive, and under the stormwater pond between Hoya and Anderson Dahlen north of 143rd <br />Avenue. <br />• Alternate bid —Specifies directional drilling of plastic (PVC) watermain across as much of the project area as <br />feasible. <br />Copies of the title sheet and general layout are attached for reference and the general layout shows all locations of <br />the proposed open trenching and direction drilling for the base bid. <br />Bids were publicly opened on Tuesday, January 4, 2022, at 10:00 a.m. A total of two (2) bids were received. Bids <br />ranged from a high of $8,391,994.66 to a low of $6,737,287.45 across two bid schedules. Schedule 1 reflected the <br />base bid (combination of open trench and horizontal directional drilling (HDD) installation methods), while <br />Schedule 2 reflected the alternate bid (only HDD installation method). Below is a table showing the two bids <br />received. <br />Contractor <br />Total Schedule 1 Bid Total Schedule 2 Bid <br />Park Construction Co. $6,737,287.45 <br />Forest Lake Contracting, Inc. $7,652,529.55 <br />Engineer's Estimate $4,875,068.50 <br />$7,059,102.16 <br />$8,391,994.66 <br />$4, 916,194.50 <br />The low bid received is reflected in the Schedule 1 bid and was submitted by Park Construction Company, of <br />Minneapolis, MN in the amount of $6,737,287.45. This bid was approximately 38% higher than the Engineer's <br />Estimate of $4,875,068.50 due mainly to highly inflated PVC pipe costs, which is reflected in both bids. <br />Timeframe: <br />Staff anticipates 15 minutes will be required to present and discuss this case. <br />Observations/Alternatives: <br />