My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br />January 12, 2022 <br />Page 2 <br />to predict future trends with the construction market, waiting to rebid allows time for supply chain and <br />pandemic issues possibly work themselves out and influence costs to a lesser degree. <br />It is also recommended to evaluate the economics of utilizing ductile iron pipe (DIP) as material alternate <br />for areas of the project associated with open cut installation of the water main along with the feasibility of <br />increasing the amount of open cut pipe installation to evaluate any additional cost savings. <br />Also note, DIP pipe has a current lead time of approximately 30 weeks. If it is determined DIP pipe will be <br />included in the rebid, lead times will need to be evaluated at that time to allow a bid opening date to be <br />set that allows for timely delivery of pipe materials. <br />ces <br />c: file <br />x:\pt\r\ramsy\159783\6-bid-const\elevated bid costs memo.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.