My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Staff will provide an update on the public open house held January 12, 2022 <br />• CSAH 116 Interim Improvements <br />• Construction substantially complete <br />• Sunwood Drive signal system will be installed February/March 2022 <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction scheduled for 2022 — 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve <br />o $45M in bonds authorized October 2020 <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction scheduled for 2022 — 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• 5805 148th Lane NW <br />• Update anticipated in February or March 2022 <br />• FYA Improvements at Sunwood Drive and Ramsey Boulevard <br />• SEH completing Feasibility Analysis <br />• Elk River Highway 10 Study <br />• Update anticipated in February or March 2022 <br />• Anoka Solution Highway 10 Improvements <br />• Construction scheduled for 2022 — 2023 <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary design is being completed <br />• Final design is ready to begin <br />• Fully funded (per preliminary cost estimates) <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />N/A <br />Recommendation: <br />N/A <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.