My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the park work. <br />Infrastructure Improvements <br />Zeolite Street NW needs to be reconstructed and brought up to current city street standards. Coordinating this <br />project with the filling of Parcel 46 and relocation of the wetland would make sense due to the traffic and hauling <br />of the dirt between Parcel 46 and The Waterfront. The connection of West Ramsey Parkway and related utilities <br />should also be considered as part of this project. (See Bolton and Menk Study) <br />Timeframe: <br />In order to bring Parcel 46 to the market, Staff is asking for this project to be considered for 2022 <br />Observations/Alternatives: <br />Alternatives include: <br />1) Direct Staff to gather more information on cost for each facet of the project internally and report back to Public <br />Works Committee for further discussion. <br />2) Recommend to City Council to have Staff hire consultants and have staff gather more information for each facet <br />of the project. <br />3) Recommend to City Council to commit to the project to obtain and place fill on Parcel 46, relocate the wetland <br />and to coordinate with The Waterfront site planning and development. <br />3) Something else. <br />Funding Source: <br />To be determined. It is likely that different facets of this project would be handled by different funding sources. <br />Potential funding sources include: <br />• PIR <br />• Sewer and/or Water Fund <br />• Park Dedication / Trust Fund, <br />• TIF <br />• EDA <br />• Wetland bank <br />Recommendation: <br />Direct Staff to gather more information on cost for each facet of the project internally and report back to the Public <br />Works Committee for further discussion. <br />Action: <br />Based on discussion. <br />Exhibit 1 - COR Cut and Fill Volumes <br />BMI COR Analysis Study <br />Site Location Map <br />Exhibit 2 - Soil Boring Reports <br />The Waterfront looking SW, Center St. at left <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 01/13/2022 02:14 PM <br />Mark Riverblood Mark Riverblood 01/13/2022 02:59 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.