My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Front <br />Ramsey, Minnesota <br />NTI Project No. 18.MSP05470.000 <br />1.0 INTRODUCTION <br />1.1 Site / Project Description <br />The proposed project consists of the utilizing the on -site materials for construction in various locations. <br />1.2 Scope of Services <br />The purpose of this factual report is to present a summary of our geotechnical exploration and provide <br />the soil conditions encountered at the project area. Our "Scope of Services" was limited to the <br />following: <br />1. Explore the project subsurface by means of nine (9) SPT soil borings. Six (6) SPT borings were <br />advanced to depths between 23 and 30 feet and three (3) SPT borings were advanced to depths <br />of approximately 14.5 feet existing grade. <br />2. Conduct laboratory test(s) on representative samples for characterizing the index and <br />engineering properties of soils strata. <br />3. Provide a factual geotechnical report with the results of our field and laboratory tests. <br />2.0 EXPLORATION PROGRAM RESULTS <br />2.1 Exploration Scope <br />Site geotechnical exploration began on May 15, 2018, with individual SPT soil borings advanced to <br />varying feet below existing grade at approximate locations as presented on the diagram within the <br />appendices. Soil samples were taken at 2 %-foot intervals to termination depth of the borings. <br />NTI located the borings relative to existing site features, and determined the approximate elevation of <br />the borings using MnTOPO LiDAR maps. Boring elevations should be considered to be approximate. <br />Please refer to the Boring/Probe Location Diagram and the Boring Logs in Appendix C. <br />The boreholes were backfilled with auger cuttings, or were abandoned using high solids bentonite or <br />neat cement grout as per appropriate local and state statutes. Minor settlement of the boreholes will <br />occur. Owner is responsible for final closure of the boreholes. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.