My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/11/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 01/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:14:27 PM
Creation date
1/26/2022 11:02:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/11/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. NO -BUILD ALTERNATIVE <br />To address the impacts of a development on the surrounding roadway system, it is necessary to predict the <br />traffic that would be present on the roadway system at the time (the design year) of completion of the <br />proposed development, without the inclusion of the proposed development. This is considered the No - <br />Build scenario, and serves as a basis with which to compare Build scenarios. In this study two design years <br />were analyzed 2026, the year after the development is fully built and occupied, and 2040, the current <br />planning year horizon. <br />A. Background Growth <br />Review of the latest City of Ramsey Comprehensive Transportation Plan and Anoka County 2040 <br />Transportation Plan indicate the traffic in the area is expected to increase. Two methods of estimating <br />future conditions were employed in the comprehensive plan, a factor was applied to background conditions, <br />and traffic from Transportation Analysis Zones (TAZs) was considered. The results show traffic will grow <br />by approximately 2.0 percent per year between now and 2040. That said, the development of this site was <br />considered and included in the TAZ forecast of future traffic on the roadways surrounding the site, <br />accounting for more than 80 percent of the future estimates. To ensure a conservative estimate this study <br />includes a growth factor of 1.0 percent per year added to the existing traffic. It is noted, the growth factor <br />plus the traffic from proposed development exceeds the traffic forecast by Anoka County and the City of <br />Ramsey estimates. Further, this rate is likely conservative as ITE and the Transportation Research Board <br />suggest traffic patterns will permanently change due to the impact of COVID-19 with fewer home to work <br />and work to home trips likely to occur in the future. Figures 5 and 6 illustrate the anticipated 2026 and <br />2040 No -Build peak hour traffic volumes. <br />Traffic Impact Study <br />Page 11 Sotarra - Trott Brook <br />S2 Traffic Solutions August 10, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.