Laserfiche WebLink
III. NO -BUILD ALTERNATIVE <br />To address the impacts of a development on the surrounding roadway system, it is necessary to predict the <br />traffic that would be present on the roadway system at the time (the design year) of completion of the <br />proposed development, without the inclusion of the proposed development. This is considered the No - <br />Build scenario, and serves as a basis with which to compare Build scenarios. In this study two design years <br />were analyzed 2026, the year after the development is fully built and occupied, and 2040, the current <br />planning year horizon. <br />A. Background Growth <br />Review of the latest City of Ramsey Comprehensive Transportation Plan and Anoka County 2040 <br />Transportation Plan indicate the traffic in the area is expected to increase. Two methods of estimating <br />future conditions were employed in the comprehensive plan, a factor was applied to background conditions, <br />and traffic from Transportation Analysis Zones (TAZs) was considered. The results show traffic will grow <br />by approximately 2.0 percent per year between now and 2040. That said, the development of this site was <br />considered and included in the TAZ forecast of future traffic on the roadways surrounding the site, <br />accounting for more than 80 percent of the future estimates. To ensure a conservative estimate this study <br />includes a growth factor of 1.0 percent per year added to the existing traffic. It is noted, the growth factor <br />plus the traffic from proposed development exceeds the traffic forecast by Anoka County and the City of <br />Ramsey estimates. Further, this rate is likely conservative as ITE and the Transportation Research Board <br />suggest traffic patterns will permanently change due to the impact of COVID-19 with fewer home to work <br />and work to home trips likely to occur in the future. Figures 5 and 6 illustrate the anticipated 2026 and <br />2040 No -Build peak hour traffic volumes. <br />Traffic Impact Study <br />Page 11 Sotarra - Trott Brook <br />S2 Traffic Solutions August 10, 2021 <br />