My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/11/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 01/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:14:27 PM
Creation date
1/26/2022 11:02:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/11/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trott Brook Crossing EAW Traffic Study Review <br />Table 8. Year 2040 Build Conditions Peak Hour Capacity Analysis <br />January 6, 2022 <br />Intersection <br />A.M. Peak Hour <br />P.M. Peak Hour <br />LOS <br />Delay <br />LOS <br />Delay <br />Variolite Street NW / Alpine Drive (1) <br />A/A <br />5 sec. <br />A/A <br />4 sec. <br />Variolite Street NW / 161st Avenue NW (1) <br />A/A <br />5 sec. <br />A/A <br />6 sec. <br />Variolite Street NW / Trott Brook Crossing <br />A/A <br />4 sec. <br />A/A <br />6 sec. <br />Variolite Street NW / 173rd Avenue NW (1) <br />A/A <br />2 sec. <br />A/A <br />3 sec. <br />Nowthen Boulevard NW / Ramsey Boulevard NW <br />A/C <br />15 sec. <br />C/F <br />86 sec. <br />Nowthen Boulevard NW / 167th Avenue NW (1) <br />A/B <br />10 sec. <br />B/F <br />57 sec. <br />Nowthen Boulevard NW / 173rd Avenue NW (1) <br />A/A <br />7 sec. <br />A/A <br />6 sec. <br />Nowthen Boulevard NW / 175th Avenue NW (1) <br />A/A <br />5 sec. <br />A/A <br />8 sec. <br />175th Avenue NW/ North Brook Meadow (1) <br />A/A <br />3 sec. <br />A/A <br />5 sec. <br />(1) Indicates an unsignalized intersection with side -street stop control, where the overall LOS is shown followed by the worst approach <br />LOS. The delay shown represents the worst side -street approach delay. <br />While the intersections are expected to operate acceptably overall, there are side -street delays that <br />reach a LOS F at the Nowthen Boulevard NW intersections with Ramsey Boulevard NW and 167th <br />Avenue NW. The following information summarizes the operational and/or queuing issues that <br />warrant consideration as traffic volumes increase. <br />• Nowthen Boulevard NW / Ramsey Boulevard NW <br />o The side -street delay in the eastbound direction is 15 seconds for the a.m. peak and 86 seconds <br />for the p.m. peak hour. The 95th percentile queues in the eastbound direction are expected to <br />be approximately 80 feet during the a.m. peak hour and 425 feet during the p.m. peak hour. <br />o Side -street delay is expected to increase by approximately three (3) seconds per vehicle during <br />the a.m. peak and 43 seconds per vehicle during the p.m. peak as compared to year 2040 no <br />build conditions. <br />• Nowthen Boulevard NW / 167th Avenue NW <br />o The side -street delay in the westbound direction is 10 seconds for the a.m. peak and 57 seconds <br />for the p.m. peak hour. The 95th percentile queues in the westbound direction are expected <br />to be approximately 55 feet during the a.m. peak hour and 145 feet during the p.m. peak hour. <br />The 95th percentile queues in the eastbound direction are expected to be approximately 65 <br />feet during the a.m. peak hour and 80 feet during the p.m. peak hour. <br />o Side -street delay is expected to increase by approximately one (1) second per vehicle during <br />the a.m. peak and nine (9) seconds per vehicle during the p.m. peak as compared to year 2040 <br />no build conditions. <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.