Bruce Westby, P.E. <br />October 21, 2021 <br />Page 5 <br />• BN Railroad permit (Design Alternate Watermain Loop) <br />SCHEDULE AND COMPENSATION <br />Project Schedule <br />We will begin our work immediately after authorization. We will work with the City of Ramsey to <br />advance the schedule to allow for bidding in the winter of 2021/2022. Construction is anticipated to begin <br />in early summer of 2022. Some items such as controls. pumps. and generator have longer lead times. <br />meaning final completion may not occur until the end of 2022. <br />Compensation <br />We have prepared an estimate of time and included not -to -exceed fees associated with completing the <br />tasks described in this letter. The estimate is attached to this letter for review and concurrence. <br />Design Alternate <br />Fees associated with the design alternate trunk watermain loop are broken out within the attached <br />spreadsheet. Additional work associated with the design alternate include additional topographic survey, <br />geotechnical exploration, construction documents permitting, and approvals. <br />If there are any questions related to this proposal, please call me at (651) 968-7760. <br />Sincerely, <br />Bolton & Menk, Inc. <br />Kevin P. Kielb, P.E. <br />Project Manager <br />ATTACHMENTS <br />Fee Spreadsheet <br />Utility Improvements Graphic <br />Bolton & Menk is an equal opportunity employer. <br />