Laserfiche WebLink
Provide a plan timeline, along with regular communication on progress, regarding the above to the residents of <br />Xkimo Ct. Nw. <br />After the Public Works Committee considered the residents request on October 19, 2021, the committee directed <br />Staff to contact the developer and their engineer to determine if either or both would be willing to partner with the <br />City to redesign, reconstruct and/or extend the noise wall to serve it's intended purpose. The Committee also <br />directed Staff to return with estimated costs to reconstruct and/or extend the sound wall to the end of the plat and/or <br />to connect to the existing wall to the north for consideration at a future meeting. <br />Staff contacted the developer, Riverside Development Company, and has since received three response letters from <br />their attorney informing Staff that the developer is willing to assist the City in resolving this matter by providing a <br />history of past discussions and to offer its opinion on any potential changes to the wall, but that they are not <br />agreeable to assuming any financial liability associated with such changes. Their attorney also noted that the City <br />cannot continue to retain any of their clients financial securities outside of what is allowed by the Development <br />Agreement, namely their one-year warranty and landscaping warranty. Staff is therefore preparing to return all <br />securities outside of the warranty securities outlined within the Development Agreement. <br />Staff also contacted the design engineer, Bogart -Pederson, to discuss their willingness to assist the City in resolving <br />this matter. According to Bogart -Pederson they informed City Staff that any wall constructed on their client's <br />property would not be able to serve as a noise wall due to the low elevations on site, and that constructing a wall <br />within Highway 47 right-of-way would not likely be economically feasible due to the need to relocate existing <br />buried utilities and overhead power lines, but Staff instructed them to construct the wall per the plans. However, <br />Bogart -Pederson is willing to share their topographic survey with the City so we can look at the potential for <br />relocating the wall within the Highway 47 right-of-way. <br />Any efforts to relocate or extend the existing sound wall could not begin until the ground thaws in the spring of <br />2022. This would include collection of additional topographic survey to determine where a sound wall could <br />effectively be constructed along the corridor. For a sound wall to be effective it should be constructed to a height of <br />6-feet or more above the pavement on Highway 47. <br />Attached is the figure showing how long the sound wall would need to extend to the north of the Ramsey Villas <br />North plat to connect to the existing sound wall approximately 900 feet north. <br />Staff estimates construction costs for a similar noise wall would be approximately $210 per linear foot at today's <br />construction costs. This would equate to a minimum construction cost of $50,000 to salvage and reinstall the <br />existing wall within the Highway 47 right-of-way and to extend the wall to the north end of the Ramsey Villas <br />North plat, if possible, and a minimum construction cost of $125,000 to extend the wall through the undeveloped <br />parcel to the north to connect to the existing wall. These costs do not include indirect costs or costs required to enter <br />into a Limited Use Permit with MnDOT if the wall can indeed be constructed within their right-of-way. <br />Timeframe: <br />Staff estimates 15 minutes will be needed to present this case and respond to questions. <br />Observations/Alternatives: <br />Staff informed the Xkimo Court residents that this case would be presented this evening so one or more residents <br />may be in attendance. <br />Funding Source: <br />Funding amounts and sources will be discussed in detail on March 15th. <br />Recommendation: <br />Staff does not have a recommendation at this time. <br />