My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 02/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:17:52 PM
Creation date
3/1/2022 11:41:58 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the <br /> parties hereto agree as follows: <br /> 1. Construction of the Storm Water Management Practices. The Developer shall <br /> construct the Storm Water Management Practices according to the Plans. <br /> 2. Maintenance of the Storm Water Management Practices. The Developer shall repair <br /> and maintain the Storm Water Management Practices at no expense to the City. The Developer <br /> shall be solely responsible for such repair and maintenance and the costs thereof. Maintenance of the <br /> Storm Water Management Practices shall include, but not be limited to: <br /> a. Semi-annual inspections of all sump manholes and pond outfalls (flared end <br /> sections), with one in each spring (to remove debris, winter salt and sand deposits, etc.), and <br /> autumn(to. remove vegetation, sediment, debris, leaves, etc.). If necessary, corrective actions, <br /> including removal of all litter and debris, and replacement of mulch, vegetation, and eroded <br /> areas to ensure establishment of healthy functioning plant-life therein, shall be executed. Such <br /> inspections and corrective actions shall be documented in a maintenance log retained by the <br /> Developer and submitted to the City upon request; and <br /> b. Bi-annual inspections and certifications by a professional engineer (provided <br /> by the Developer) that the Storm Water Management Practices are functioning in <br /> accordance with the Plans, and the ponding facilities have maintained the proper operation of <br /> storm water treatment in accordance with City and Lower Rum River Watershed Management <br /> Organization standards. Copies of the bi-annual inspection reports shall be provided to the <br /> City within 30 days of their preparation. <br /> If, as a result of any inspection by the Developer or City staff, it is determined that the Storm <br /> Water Management Practices (i) have not been maintained, or (ii) are not functioning as originally <br /> designed and intended, or (iii) are in need of repair, the Developer shall restore the Storm Water <br /> Management Practices so that they function as they were originally designed and intended pursuant <br /> to the Plans. <br /> The Developer agrees to be solely responsible for the repair and maintenance of the Storm <br /> Water Management Practices and the Developer shall bear all costs of such maintenance. If the <br /> Developer does not undeltake the necessary maintenance within thirty(30) days of notification by the <br /> City, the City may contract such maintenance, and the costs reasonably incurred by the City for <br /> contracting such maintenance shall be reimbursed to the City by the Developer. <br /> 3. Assessment. The Developer hereby waives any statutory right to contest any <br /> assessment by the City for its costs of maintenance/repair as permitted herein, on the basis of the <br /> benefit to the Property. <br /> 4. Future City Polices Notwithstanding anything contained in this Agreement to the <br /> contrary, in the event the City shall, in the future, establish a policy for repair and maintenance by the <br /> City of storm water management practices owned by private parties located elsewhere in the City <br /> under which policy the costs of such repair and maintenance are to be paid either out of general City <br /> revenues or by collection of utility or service fees or charges,the Developer shall be entitled to petition <br /> the City for the inclusion of the Storm Water Management Practices under such repair and <br /> maintenance program. The recording of a certified copy of the resolution of the City Council of the <br /> City which sets forth the consent and authorization described in the foregoing sentence shall serve to <br /> terminate this Agreement, without further action on the part of any party hereto. <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.