|
PAY ESTIMATE NO. 9 OWNER
<br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW
<br />
<br />Bid Schedule "A" - S.A.P. 199-104-07 - Sunwood Drive NW Conlinued
<br />
<br /> ITEM ITEM QTY UNIT UNIT COST CONTRACT USED TO- EXTENSION
<br /> NO. AMOUNT DATE
<br />
<br />60 I" & i Si~n Panel Type "D" 7 EACH $258.00 EACH $1,806.00 $0.00
<br />~,1 '1 YPF. lit BARRII)ADE I 1 EACH $309.60 EACH $3,405.60 2 $619.20
<br />t~2 I'AVF, MENT MESSAGE (ONLY) POLY PREFORMED 32 EACH $387.00 EACH $12,384.00 $0.00
<br />63 P/X. VF. MENT MF. SSAGE (RR CROSSING) PAINT 2 EACH $159.96 EACH $319.92 1 $159.96
<br />(,,1 P_AVEMENT MUSSAGE (COMBINATION ARROW)PAINT 4 EACH $82.56 EACH $330.24 $0.00
<br />_. t,~5~ P.,\VEMI'~NT MESSAGE (RIGIIT ARROW) POLY PREFORMED 12 EACH $309.60 EACH $3,715.20 9 $2,786.40
<br />66 ~P.AVEMENT,ME,'qSAGE (LEFT ARROW) POLY PREFORMED 28 EACH $309.60 EACH $8,668.80 3 $928.80
<br />67 1" BROKEN I,INI'; YELLOW EPOXY 200 LF $0.51 LF $102.00 5064 $2,682.64
<br />68 ,1" SOLID I,INE WI lITE - EPOXY 12500 LF $0.50 LF $6,250.00 266 $133.00
<br />69 ,l" BI*,OKEN LINE WHITE - EPOXY 3150 LF $0.50 LF '$1:,575.00 785 $:392.50
<br />__ 70_ 24" STOl' LINE WI lITE - EPF)XY 800 LF $7.22 LF $5,776.00 $0.00
<br />
<br />71 36" SOl,ID LINt( WIII'YE - EPOXY · I100 LF $8.67 LF $9,537.00 $0.00
<br />72 1,I" l)OlJItl,l£ SC)LID LINE YELl, OW- EPOXY 7350 LF $1.01 LF $7,423.50 792 $799.92
<br />.. 73 !24" SOLtl) LINE YELLOW - EPOXY 1670 LF $5.68 LF $9,485.60 226 $1,283.68
<br />7,i _],1" S( )LID I,INE WI lITE - PAINT 3000 LF $0.41 LF $1,230.00 725 $297.25
<br />
<br /> 75 ,1" DflUIII,F. S()I,ID LINE YELLOW - PAINT 2300 LF $0.83 LF $1,909.00 $0.00
<br /> 76 24" Y, OLID I,INE YEI,I,OW - PAINT 330 LF $2.58 LF $851.40 0 $0.00
<br /> 77 NM( I,OOP DETECTOR 6' X 6' 43 EACH $485.04 EACH $20,856.72 42 $20,371.68
<br /> 7g PVC ItANI)tI()LI~ (NIETAL FRAME AND COVER) 23 EACH $567.60 EACH $13,054.80 21 $11,919.60
<br /> 79 INSTALl, 4"-6" PVC (SCI140) CONDUIT 2400 LF $6.45 LF $15,480.00 6244 $40,273.§0
<br /> 8o F & 1,1" RI(BI) S'I'EEI~ CONDUIT 430 LF $25.18 LF $10,827.40 430 $10,827.40
<br /> 8t HALE CI IECK 200 EACH $11.87 EACH $2,374.00 $0.00
<br /> 82 SII,T FI';NCF~ TYI EMACtlINE SLICED 1000 LF $1.81 LF $1,810.00 $0.00
<br /> g3 TEMPORARY CONSTRIJCTION ROCK ENTRANCE 2 EACH $2,412.51 EACH $4,825.02 2 $4,825.02
<br /> 84 ShEDING 3.0 ACRE $258.00 ACRE $774.00 0 $0.00
<br /> 85 SOl)DING, TYPE LAWN 5000 SY $2.48 SY $12,400.00 768 $1,904.64
<br /> 8(, SEED MIXTURE 260 300 LB $2.63 LB $789.00 $0.00
<br /> 87 MIJIA~'tl MATERIAL TYPE 3 6 TON $154.80 TON $928.80 $0.00
<br />
<br /> 88 ERO.C, ION (?()NTROL BLANKETS CATEGORY 3 100 SY $1.55 SY $155.00 $0.00
<br /> 89 ]COMM[.;R¢:IAI, FERTILIZER ANALYSIS 24-2-24 1200 LBS $0.36 LBS $432.00 $0.00
<br />
<br />T,~tnl llid Schedule "A" $1,951,654.92 $1,678,804.56 ·
<br />
<br />3171/ra3171poPAY ESTIMATE NO. 9 PE-3
<br />
<br />
<br />
|