Laserfiche WebLink
Summary of Project Costs for Oak Terrace Estates <br /> <br />Total Bid <br />Less Trunk Costs <br />Assessed Construction Cost <br />Plus 25% Overhead <br />Plus Trunk Cost <br />Total Assessed Cost <br /> <br />$447,486.05 <br />$25,140.84 <br /> <br />$422,345.21 <br />$105,586.30 <br />$221.,805;00 <br /> <br />$749,736.51 <br /> <br />WAC and SAC Charges <br /> <br />$282,162.00 * <br /> <br />Total Cost of Sewer, Water, <br />Storm Sewer and Streets for Oak <br />Terrace Estates <br /> <br />$1,031,898.51 <br /> <br />* Total due at Time of Connection <br /> <br /> <br />