Laserfiche WebLink
Federal Register/Vol. 87, No. 18/Thursday, January 27, 2022/Rules and Regulations 4411 <br /> wastewater and stormwater are the improvements that increase the capacity the types of projects eligible under <br /> typical responsibilities of"water and of existing infrastructure and extend the either the DWSRF or CWSRF also <br /> sewer"authorities throughout the useful life of existing infrastructure. support efforts to address climate <br /> country,and there is a tremendous need Accordingly,water and sewer change. For example,by taking steps to <br /> for improvements to the ability of state, infrastructure investment projects manage potential sources of pollution <br /> local,and Tribal governments to include those that conserve water, and preventing these sources from <br /> provide such services,including to thereby reducing pressure on reaching sources of drinking water, <br /> address the consequences of deferred infrastructure for the provision of projects eligible under the DWSRF and <br /> maintenance and additional resiliency drinking water,and that recycle CWSRF may reduce energy required to <br /> needed to adapt to changes to the wastewater and stormwater,thereby treat drinking water. Similarly,projects <br /> climate.306 reducing pressure on the infrastructure eligible under the DWSRF and CWSRF <br /> Although the meaning of water and for treating and managing wastewater include measures to conserve and reuse <br /> sewer infrastructure for purposes of and stormwater. water,for example through projects to <br /> sections 602(c)(1)(D) and 603(c)(1)(D) of As with other infrastructure projects reuse or recycle wastewater, stormwater, <br /> the Social Security Act does not include and capital expenditure projects that are or subsurface drainage water. Treasury <br /> all water-related uses,Treasury has permitted as responses to the public encourages recipients to consider green <br /> made clear in this final rule that health emergency and its negative infrastructure investments and projects <br /> investments to infrastructure include a economic impacts,costs for planning to improve resilience to the effects of <br /> wide variety of projects.Treasury and design and associated pre-project climate change. For example,more <br /> interprets the word"infrastructure" in costs are eligible uses of SURF funds. frequent and extreme precipitation <br /> this context broadly to mean the Costs for the acquisition of land are also events combined with construction and <br /> underlying framework or system for eligible,but only if needed for the development trends have led to <br /> achieving the given public purpose, purposes of locating eligible project increased instances of stormwater <br /> whether it be provision of drinking components. Recipients should ensure runoff,water pollution,and flooding. <br /> water or management of wastewater or that they have the technical,financial, Green infrastructure projects that <br /> stormwater.307 As discussed below,this and managerial capability to ensure support stormwater system resiliency <br /> can include not just storm drains and compliance with the requirements of the could include bioretention basins that <br /> culverts for the management of SDWA, or that the assistance will provide water storage and filtration <br /> stormwater,for example,but also ensure compliance and the owners or benefits, and green streets,where <br /> bioretention basins and rain barrels operators of the systems will undertake vegetation, soil, and engineered systems <br /> implemented across a watershed, feasible and appropriate changes in are combined to direct and filter <br /> including on both public and private operations to ensure compliance over rainwater from impervious surfaces. In <br /> property,that together reduce the the long-term. cases of a natural disaster,recipients <br /> amount of runoff that needs to be Drinking Water State Revolving Fund may also use SURF funds for water <br /> managed by traditional infrastructure. and Clean Water State Revolving Fund infrastructure to provide relief, such as <br /> Further,Treasury understands that interconnecting water systems or <br /> investments in infrastructure include Background:As stated above,in the rehabilitating existing wells during an <br /> interim final rule,Treasury included extended drought. <br /> 306In addition,Treasury interprets the eligible eligible uses of the DWSRF and the Public Comment:Many commenters <br /> uses of SURF funds against the background of the CWSRF as eligible uses of the SURF in expressed support for the interim final <br /> Coronavirus Relief Fund(CRF),for which the the water and sewer infrastructure rule's alignment of the use of funds for <br /> SURF funds are,in part,a successor.CRF g <br /> recipients expressed great interest in using the CRF category. By providing that projects water and sewer infrastructure under <br /> to pursue water infrastructure projects,including eligible under the DWSRF and the the SURF with the project categories <br /> provision of drinking water and internal plumbing CWSRF are also eligible uses of SURF ' <br /> on Tribal lands and in Alaskan villages,and g provided through the EPA s DWSRF and <br /> final broadband projects throughout the country; funds,the interim rule permitted a CWSRF programs. <br /> Treasury permitted these projects given the broad range of projects that improve Many commenters also provided <br /> connection to the public health emergency(see drinking water infrastructure,such as recommendations about the specific <br /> Coronavirus Relief Fund for States,Tribal building or upgrading facilities and types of water infrastructure projects <br /> Governments,and Certain Eligible Local transmission, distribution, and storage that should be eligible under the final <br /> Governments,86 FR 4182,4190,4192(Jan.15, <br /> 2021),but the short deadline for use of funds made systems,including replacement of lead rule. In many of these cases, <br /> it difficult to use CRF funds in this way.Congress' service lines.With respect to clean commenters recommended that <br /> inclusion of the water,sewer,and broadband clause water and wastewater infrastructure the Treasury include project types that are <br /> in the ARPA,along with the SURF funds'longer ' <br /> final eligible use date,is responsive to this unmet need. interim rule provided that already eligible under the DWSRF and <br /> As discussed below,Congress in the Infrastructure recipients may use SURF funds to CWSRF and thus eligible under the <br /> Investment and Jobs Act amended sections 602(c) construct publicly owned treatment interim final rule and final rule.For <br /> and 603(c)of the Social Security Act to add a new infrastructure,manage and treat example, several commenters requested <br /> paragraph as sections 602(c)(4)and 603(c)(5), <br /> respectively,providing that SURF funds may be stormwater or subsurface drainage that aquifer recharge projects, or other <br /> used to meet non-federal matching requirements of water,and facilitate water reuse, among groundwater protection and restoration <br /> any authorized Bureau of Reclamation project.This other uses. Consistent with the DWSRF projects,be included as eligible uses of <br /> authority was added as a separately enumerated <br /> eligible use regardless of whether the underlying and the CWSRF,the interim final rule SURF when certain aquifer recharge <br /> project would be an eligible use of SURF funds provided that SURF funds may be used projects that(1) implement a nonpoint <br /> under the water and sewer infrastructure eligible for cybersecurity needs to protect water source pollution management <br /> use category. or sewer infrastructure,such as program 308 or(2) constitute reuse of <br /> 307 See,e.g.,section 502 of the Federal Water <br /> Pollution Control Act(33 U.S.C.1362),defining developing effective cybersecurity <br /> "green infrastructure"as"the range of measures practices and measures at drinking 308 Specifically,this would include desalination <br /> that use plant or soil systems,permeable pavement water systems and publicly owned projects that decrease the burden on aquifers where <br /> or other permeable surfaces or substrates, there is causal relationship between aquifer <br /> stormwater harvest and reuse,or landscaping to treatment works. withdrawals and saltwater intrusion if the projects <br /> store,infiltrate,or evapotranspirate stormwater and IISe Of DWSRF and CWSRF to Support implement a nonpoint source pollution <br /> reduce flows to sewer systems or to surface waters." Climate Change Adaptations.Many of Continued <br />