My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/08/2022
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2022
>
Agenda - Council Work Session - 03/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:19:34 PM
Creation date
3/9/2022 11:50:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/08/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4452 Federal Register/Vol. 87, No. 18/Thursday, January 27, 2022/Rules and Regulations <br /> (b)(1) of such regulation to address identified need,as determined by the (b) Violation.Treasury will consider a <br /> present or prevent future violations of recipient,for such infrastructure; State or Territory to have used funds to <br /> health-based drinking water standards, (B)The broadband infrastructure is offset a reduction in net tax revenue if, <br /> if the following conditions are met: designed to,upon completion: during a reporting year: <br /> (A)The project is needed to support (1)Reliably meet or exceed (1) Covered change.The State or <br /> increased population,with need symmetrical 100 Mbps download speed Territory has made a covered change <br /> assessed as of the time the project is and upload speeds;or that, either based on a reasonable <br /> undertaken; (2)In cases where it is not practicable, statistical methodology to isolate the <br /> (B) The project is designed to support because of the excessive cost of the impact of the covered change in actual <br /> no more than a reasonable level of project or geography or topography of revenue or based on projections that use <br /> projected increased need,whether due the area to be served by the project,to reasonable assumptions and do not <br /> to population growth or otherwise; provide service reliably meeting or incorporate the effects of <br /> (C) The project is a cost-effective exceeding symmetrical 100 Mbps macroeconomic growth to reduce or <br /> means for achieving the desired level of download speed and upload speeds: increase the projected impact of the <br /> service; and (i)Reliably meet or exceed 100 Mbps covered change,the State or Territory <br /> (D)The project is projected to download speed and between at least 20 assesses has had or predicts to have the <br /> continue to provide an adequate level of Mbps and 100 Mbps upload speed; and effect of reducing tax revenue relative to <br /> drinking water over its estimated useful (ii)Be scalable to a minimum of 100 current law; <br /> life. Mbps download speed and 100 Mbps (2)Exceeds the de minimis threshold. <br /> (vi)Dams and reservoirs. upload speed; and The aggregate amount of the measured <br /> Rehabilitation of dams and reservoirs if (C)The service provider for a or predicted reductions in tax revenue <br /> the following conditions are met: completed broadband infrastructure caused by covered changes identified <br /> (A)The project meets the investment project that provides service under paragraph(b)(1) of this section,in <br /> requirements of 40 CFR 35.3520 other to households is required, for as long as the aggregate,exceeds 1 percent of the <br /> than the following requirements: the SLFRF-funded broadband State's or Territory's baseline; <br /> (1)The prohibition on the infrastructure is in use,by the recipient (3)Reduction in net tax revenue. The <br /> rehabilitation of dams and reservoirs in to: State or Territory reports a reduction in <br /> 40 CFR 35.3520(e)(1)and (3); and (1)Participate in the Federal net tax revenue,measured as the <br /> (2)The requirement in 40 CFR Communications Commission's difference between actual tax revenue <br /> 35.3520(b)(1)that the project is needed Affordable Connectivity Program(ACP) and the State's or Territory's baseline, <br /> to address present or prevent future through the lifetime of the ACP; or each measured as of the end of the <br /> violations of health-based drinking (2) Otherwise provide access to a reporting year;and <br /> water standards,provided that if the broad-based affordability program to (4) Consideration of other changes. <br /> dam or reservoir project does not meet low-income consumers in the proposed The aggregate amount of measured or <br /> this requirement,the project must be service area of the broadband predicted reductions in tax revenue <br /> needed to support increased population, infrastructure that provides benefits to caused by covered changes is greater <br /> with need assessed as of the time the households commensurate with those than the sum of the following,in each <br /> project is undertaken, and the project provided under the ACP through the case,as calculated for the reporting <br /> must be projected to continue to provide lifetime of the ACP. year: <br /> an adequate level of drinking water over (ii) Cybersecurity infrastructure (i) The aggregate amount of the <br /> its estimated useful life; investments. Cybersecurity expected increases in tax revenue <br /> (B) The primary purpose of the dam infrastructure investments that are caused by one or more covered changes <br /> or reservoir is for drinking water supply; designed to improve the reliability and that, either based on a reasonable <br /> (C) The project is needed for the resiliency of new and existing statistical methodology to isolate the <br /> provision of drinking water supply, broadband infrastructure. Such impact of the covered change in actual <br /> with need assessed as of the time the investments may include the addition or revenue or based on projections that use <br /> project is initiated; modernization of network security reasonable assumptions and do not <br /> (D)The project is designed to support hardware and software tools designed to incorporate the effects of <br /> no more than a reasonable level of strengthen cybersecurity for the end- macroeconomic growth to reduce or <br /> projected increased need,whether due users of these networks. increase the projected impact of the <br /> to population growth or otherwise;and (f)Meeting the non-federal matching covered change,the State or Territory <br /> (E) The project is a cost-effective requirements for Bureau of Reclamation assesses has had or predicts to have the <br /> means for achieving the desired level of projects.A recipient may use funds to effect of increasing tax revenue; and <br /> service. meet the non-federal matching (ii)Reductions in spending,up to the <br /> (vii)Private wells.Rehabilitation of requirements of any authorized Bureau amount of the State's or Territory's net <br /> private wells,testing initiatives to of Reclamation project. reduction in total spending,that are in: <br /> identify contaminants in private wells, (A)Departments,agencies, or <br /> and treatment activities and remediation §35.7 Pensions. authorities in which the State or <br /> projects that address contamination in A recipient(other than a Tribal Territory is not using funds; and <br /> private wells,if the project meets the government)may not use funds for (B)Departments,agencies,or <br /> requirements of 40 CFR 35.3520 other deposit into any pension fund. authorities in which the State or <br /> than the limitation to certain eligible Territory is using funds,in an amount <br /> systems under 40 CFR 35.3520(a). §35.8 Tax. equal to the value of the spending cuts <br /> (2)Broadband investments—(i) (a)Restriction.A State or Territory in those departments, agencies, or <br /> General.Broadband infrastructure if the shall not use funds to either directly or authorities,minus funds used. <br /> following conditions are met: indirectly offset a reduction in the net (c)Amount and revenue reduction <br /> (A)The broadband infrastructure is tax revenue of the State or Territory cap.If a State or Territory is considered <br /> designed to provide service to resulting from a covered change during to be in violation pursuant to paragraph <br /> households and businesses with an the covered period. (b) of this section,the amount used in <br />
The URL can be used to link to this page
Your browser does not support the video tag.