A portion of the cul-de-sac located on the south end of Junkite Street has had some undercutting of the existing <br />concrete curb and gutter. This project proposes to remove and replace a portion of the concrete curb and gutter, <br />perform a full -depth restoration of the compromised road section, and provide a stabilized erosion control mat in <br />the boulevard area to prevent future erosion of the soils. <br />Review of the storm sewer, sanitary sewer and watermain did not find issues requiring repair. The City will be <br />placing inflow and infiltration (I/I) barriers on the sanitary sewer manholes with this project. The City received an <br />MCES I/I Grant for this work, which will reimburse the City for the costs associated with the 1/1 barriers. <br />Build Process <br />• Full -depth reclamation of existing bituminous pavement and aggregate base <br />• Project removals (spot curb and gutter, pedestrian ramps, driveways as needed) <br />• Place new concrete curb and gutter and pedestrian ramps (5 to 7-day cure time) <br />• Remove excess reclaim material, shape and compact 5 inches of remaining material <br />o Subgrade excavation required to remove approximately 0.5 inches below the existing reclamation <br />material to allow 4-inch thickness <br />o Excess reclaim is stockpiled and will be used on future City projects <br />• Place first lift of bituminous pavement <br />• Finish any trail and driveway repairs <br />o No driveway repairs are anticipated <br />• Restore the boulevard in any impacted areas <br />o 4 inches topsoil, seed and hydro -mulch <br />• Place the final lift of bituminous pavement <br />• Place all pavement marking, must wait 72 hours after paving <br />Preliminary Schedule Remaining <br />• Council Approves Plans and Specifications / Authorizes Ad for Bids <br />o March 22, 2022 <br />• Staff Receives Bids <br />o April 18, 2022 <br />• Council Awards Contract to the lowest responsible bidder <br />o April 26, 2022 <br />• Contractor begins construction <br />o June 2022 <br />• Contractor Substantially Completes construction <br />o September 2, 2022 <br />• Contractor Final Completion (project clean up, punch list created) <br />o September 30, 2022 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br />prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding software <br />used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all bidders are <br />notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet showing the <br />scope of the improvements, as well as a plan sheet showing the typical sections, which includes information on the <br />proposed pavement section. Plans are available upon request from the City Engineer. <br />Timeframe: <br />Staff estimates up to 10 minutes will be needed to present this case and respond to questions. <br />Observations/Alternatives: <br />