Public Works Committee <br />Meeting Date: 03/15/2022 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />5.4. <br />Title: <br />Consider Recommending City Council Approving Plans and Specifications and Authorizing Advertisement for <br />Bids for 2022 Crack Seal Improvements, Improvement Project #22-08 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approving plans and specifications and <br />authorizing advertisement for bids for 2022 Crack Seal Improvements, Improvement Project #22-08. <br />Background: <br />Crack seal improvements are completed annually on between 10 and 23 miles of public street segments to <br />cost-effectively maximize the life of the bituminous pavement. <br />Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement and <br />joints between the pavement and concrete curb and gutter, and utility castings. Reducing future pavement damage <br />due to wet subgrade soils, especially during freeze -thaw cycles. <br />The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, and <br />fourteenth year following construction, reconstruction, and overlay improvements. However, while this is the <br />typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br />adjusts the schedule of maintenance operations based on actual pavement conditions. <br />A total of 10.37 miles of public street segments are proposed to receive crack seal improvements in 2022. These <br />street segments were selected based on age, pavement maintenance history, and Pavement and Surface Evaluation <br />Rating (PASER) values of 7 or higher. <br />Plans and specifications for the 2022 Crack Sealing Improvements were prepared in-house as part of Staff s normal <br />duties. A copy of the plans is attached to this case. <br />Preliminary Schedule Remaining <br />• Council Approves Plans and Specifications / Authorizes Ad for Bids <br />o March 22, 2022 <br />• Staff Receives Bids <br />o April 18, 2022 <br />• Council Awards Contract to the lowest responsible bidder <br />o April 26, 2022 <br />• Contractor begins construction <br />o June 2022 <br />. Contractor Completes Improvements <br />o July 29, 2022 <br />Timeframe: <br />Staff estimates up to 10 minutes will be needed to present this case and respond to questions. <br />