My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/15/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 03/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:46 AM
Creation date
3/11/2022 9:15:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CSAH 52/109th <br />• CSAH 52/Quail Creek <br />• CSAH 78/113th <br />• CSAH 18/131st <br />• CSAH 18/133rd <br />• CSAH 116/Rose St. <br />• CSAH 116/Heather St. <br />• CSAH 116/CR 18 <br />• CSAH 116/Jay St. <br />• CSAH 51/91st <br />• CSAH 51/101st <br />• CSAH 51/Egret Blvd. <br />• CSAH 51/105th <br />• CSAH 51/109th <br />Anoka County is employing SEH, Inc. to prepare feasibility studies to evaluate the use of FYA operations at each <br />of these intersections, including estimating costs to modify each signal system to include FYA operations, and to <br />prepare plans and specifications for constructing the required FYA improvements. Anoka County expects to receive <br />final studies for each intersection in early 2022 to allow construction to occur in the summer/fall of 2022. <br />Anoka County is not proposing to complete FYA improvements to any signal systems in the City of Ramsey in <br />2022. No FYA improvements are proposed at the intersections of Alpine Drive & Sunfish Lake Boulevard/CSAH <br />57, Alpine Drive & Nowthen Boulevard/CSAH 5, or Sunwood Drive & Ramsey Boulevard/CSAH 56, which have <br />been discussed on several occasions. <br />FYA Operations at Sunwood Drive & Ramsey Boulevard/CSAH 56 <br />During the regular City Council meeting on September 22, 2020, the City Council received a request from Ramsey <br />resident and Planning Commission Chair Randy Bauer to install FYA's at the intersection of Sunwood Drive & <br />Ramsey Boulevard/CSAH 56. Mr. Bauer stated that he frequently waits at this signal system to turn left when no <br />vehicles are approaching from the other direction. <br />Pursuant to attached Ramsey City Council Resolution #21-302, adopted October 26, 2021, Staff hired SEH, Inc. to <br />study the feasibility for installing FYA improvements at Sunwood Drive & Ramsey Boulevard/CSAH 56. <br />Attached is a copy of the final SEH study. In summary, SEH's study notes the following findings; <br />• The City should be able to consider using Flashing Yellow Arrow operations at this intersection during <br />several hours of a typical day. However, due to higher posted speeds and higher peak hour traffic volumes on <br />CSAH 56, along with higher peak left turning traffic volumes on Sunwood Drive, SEH has concerns about <br />operating with flashing yellow arrow operations on each roadway during these peak traffic periods. <br />• For the Sunwood Drive approaches, SEH recommends considering protected only left turn phasing be used <br />both weekdays and weekends between the hours of 3:30 - 5:30 pm. For all other hours of the day and all <br />hours on weekends, protected/ permissive flashing yellow arrow operations should be able to be utilized. <br />• For the CSAH 56 approaches, SEH recommends considering protected only left turn phasing be used on both <br />weekdays and weekends between the hours of 6:30 am - 8:30 am, and also between 3:30 - 5:30 pm. For all <br />other hours of a typical weekday and weekend, flashing yellow arrow operations should be able to be utilized <br />on CSAH 56. <br />• To allow for flashing yellow arrow operation on each intersection approach, we estimate that these <br />modifications (completed by an electrical signal contractor) will cost approximately $94,000. A detailed <br />preliminary engineer's estimate of costs is attached to the study. <br />Timeframe: <br />Staff anticipates 15 minutes will be needed to present this case and respond to questions. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.