Public Works Committee 6.1. <br />Meeting Date: 03/15/2022 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Updates on Improvement Projects, Studies, and Other Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Sunwood Drive & Waco Street Reconstructions (IP #22-01) <br />o Plans are being prepared in-house <br />o Waco Street remains as is per City Council direction <br />o Council to consider approving plans and authorizing bids March 22nd <br />• Autumn Heights Street Reconstructions (IP #22-02) <br />• Plans are being prepared in-house <br />• Council to consider approving plans and authorizing bids at future meeting <br />• 2022 MSA Pavement Overlay Improvements (IP #22-03) <br />• Plans are being prepared in-house <br />• Council to consider approving plans and authorizing bids at future meeting <br />• 2022 Neighborhood Street Overlay Improvements (IP #22-04) <br />• Plans are being prepared in-house <br />• Council to consider approving plans and authorizing bids March 22nd <br />• Riverdale Drive Trunk Utility Improvements (IP #22-05) <br />• Bolton & Menk prepared plans and specs <br />• Bids opened March 11 th — Staff will provide an update during the meeting <br />• Wood Pond Hills 2nd, 3rd, 4th, 5th Addns Street Reconstructions (IP #22-06) <br />• Plans are being prepared in-house <br />• Council to consider approving plans and authorizing bids March 22nd <br />• 2022 Crack Seal Improvements (IP #22-08) <br />• Plans are being prepared in-house <br />• Council to consider approving plans and authorizing bids March 22nd <br />• WTP Trunk Watermain Improvements (#21-08) <br />• First bids rejected <br />• Revising plans to reduce project costs <br />• Re -bid revised plans in 2022 or early 2023 <br />• September 2023 completion deadline <br />• Centralized Water Treatment Plant (#21-09) <br />• AE2S is preparing plans and handling construction administration <br />• 60-percent plans nearly complete <br />• Project completion anticipated October 2023 <br />• Fire Station No. 1 Parking Lot Improvements (#21-10) <br />• Awarded to North Valley for spring/summer 2022 construction <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Preliminary design complete and property acquisitions underway <br />• Final design underway <br />