Laserfiche WebLink
PACT Charter School New Campus <br />Project Name: <br />02/17/2022 01:13 PM <br />Report Generated: <br />Provide supporting 02/17/2022 1:04 <br />documentation (Parking PM <br />Study) verifying that the <br />proposed on site parking is <br />co <br />6) <br />N <br />N Q <br />iZ: <br />N <br />O <br />02/17/2022 9:13 <br />AM <br />02/17/2022 9:13 <br />AM <br />02/17/2022 9:13 <br />AM <br />02/17/2022 9:13 <br />AM <br />02/17/2022 9:13 <br />AM <br />02/16/2022 1:55 <br />PM <br />02/16/2022 1:55 <br />PM <br />M <br />d) <br />N <br />N LL <br />V <br />N <br />O <br />A Tree Inventory and <br />Preservation Plan will be <br />required with the <br />Preliminary Plat submittal. <br />The public/quasi-public <br />distric does not contain bulk <br />standards. Thus, this <br />project (and the future <br />A ten (10) foot bituminous <br />trail will be required along <br />the north side of 161 st Ave <br />NW, extending from <br />Our Parks Staff have asked <br />about the potential of <br />shifting the stadium east <br />somewhat, which could <br />City Code requires a 16.5 <br />foot setback from <br />delineated wetlands and this <br />area must be encumbered <br />At pre plat submittal, must <br />include a landscape plan <br />that complies with City Code <br />Section 117- <br />This access must be <br />analyzed for site distances <br />and which type of access is <br />best for this location: right <br />A traffic study is required on <br />another sheet. The study <br />must also look at the <br />spacing of accesses along <br />Project is creating a <br />significant amount of <br />impervious surface. <br />Stormwater ponding area <br />Tree Inventory & <br />Preservation Plan <br />B-1 Standards <br />3 <br />H <br />Shared Parking <br />Opportunity? <br />Wetland Setback <br />Landscape Plan <br />Proposed access <br />Traffic Study <br />stormwater ponding <br />Markup Name <br />CA1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />U <br />0 <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />20220131 PACT <br />Upper School SITE <br />AND FLOOR <br />PLANS.pdf <br />Sketch Plan with <br />Contours.pdf <br />Environmental Review 0 <br />x❑ <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 '0 <br />City Planner <br />City Planner <br />City Planner <br />City Planner <br />City Planner <br />City Planner <br />City Planner <br />Civil Engineer IV <br />Civil Engineer IV <br />Civil Engineer II <br />v <br />0 <br />0 <br />N <br />C <br />-0 <br />a <br />0 <br />0 <br />N <br />C <br />Unresolved <br />Unresolved <br />'Unresolved <br />Unresolved <br />Unresolved <br />Unresolved <br />-0 <br />a� <br />0 <br />0 <br />N <br />C <br />-0 <br />0 <br />0 <br />N <br />C <br />False <br />0 <br />f0 <br />LL <br />N <br />[6 <br />LL <br />N <br />(6 <br />LL <br />N <br />(6 <br />LL <br />N <br />(0 <br />LL <br />N <br />(0 <br />LL <br />N <br />l6 <br />LL <br />N <br />lb <br />LL <br />N <br />(9 <br />LL <br />y <br />0 <br />LL <br />r <br />r <br />,- <br />Lc)(O <br />,- <br />co <br />V <br />Ln <br />N <br />d <br />3 <br />0 <br />Main Workflow <br />