My WebLink
|
Help
|
About
|
Sign Out
Home
03/08/22
Ramsey
>
Public
>
City Update
>
2022
>
03/08/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:54:19 AM
Creation date
3/11/2022 2:26:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2022
Document Title
03/08/22
Retention Date
12/31/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Home Occupation Permit Basics <br />A Home Occupation Permit is required in order to operate a business within a principal dwelling or an <br />accessory structure in the residential area. <br />There are two (2) types of Home Occupation Permit. Level I Home Occupation Permits are approved <br />administratively by City Staff if meeting the minimum thresholds as identified in City Code. Level I Home <br />Occupation Permits are low-level with no exterior evidence of the business activity. Level II Home <br />Occupation Permits require approval by the City Council after recommendation by the City Council. <br />Application Fee and Escrow <br />Application Fee (non-refundable): <br />Minimum Escrow (Level II Only): <br />$200 <br />$800* <br />*Required escrows are minimum escrows. Remaining surplus shall be refunded to the Applicant after all <br />remaining obligations are completed and accepted by the City. The Applicant shall be responsible for all <br />costs incurred by the City above the minimum escrow. More information is included in Section 2: <br />General Land Use Information portion of this document. <br />Home Occupation Procedures <br />1. Fill out the enclosed applicable application, supplemental questionnaire and pay the applicable <br />application and escrow fee. Applications cannot be processed until the application and escrow <br />fees have been paid. <br />2. Provide a detailed description of your request (attach a separate request if necessary). <br />3. Provide a site plan identifying the providing detailed information regarding the request. Such <br />information may include building and structure locations (existing and proposed) with <br />dimensions, parking areas, screening (existing and required), additional information as required <br />by the City. <br />4. If the request is related to a commercial or industrial site, a detailed site plan must be attached. <br />Home Occupation Process <br />1. Applications must be submitted to Staff thirty (30) days prior to the Planning Commission <br />meeting (see attached meeting date schedule). <br />2. The City has 15 days to determine if the application is complete. In the event that the <br />application is incomplete, Staff will notify the Applicant within the 15 days and provide direction <br />on what information is still required. <br />3. Properties located within at least 350 feet of the subject property will be notified of the request <br />and the public hearing date. <br />City Staff will prepare a report detailing the information related to the request, findings of fact <br />and proposed ordinance. <br />5. The City Council meets on the second and fourth Tuesday of every month. <br />Home Occupation Permit Guide; March, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.