My WebLink
|
Help
|
About
|
Sign Out
Home
03/08/22
Ramsey
>
Public
>
City Update
>
2022
>
03/08/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:54:19 AM
Creation date
3/11/2022 2:26:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2022
Document Title
03/08/22
Retention Date
12/31/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br />Provide and construct/furnish S/F fabricated aluminum monument with painted textured <br />finish pursuant to all specifications noted herein, and as follows: <br />I/ We agree to furnish all materials, labor and site security to perform the work below. <br />• Mobilization and deliver the above reference monument to and for River's Bend <br />Park 5000142nd Lane NW. <br />• Quoted price must include detailed shop drawings for approval, manufacturing <br />and installation. <br />• This Request for Quotation shall be a lump sum amount, with no change orders, <br />unless upon mutual agreement, the City would add to the scope of the project. <br />Work and Staging Areas: <br />Confine work activities to the monument location, with care to minimize trampling of <br />the perennial plants and woody plants (if any). Contractor is responsible for maintaining <br />safe job site conditions for the public at all times including when not present (E.g. <br />overnight). No construction activity shall be performed before 7 AM nor after 7 PM <br />Monday through Saturday. The contractor shall provide 72 hour advance notice before <br />working on Saturday. City Council approval is required for Sunday work. <br />A dumpster is not anticipated to be needed at the immediate site, and any construction <br />related disposal is to be hauled away, (and NOT placed in trash receptacles) at the park. <br />Liquidated Damages: <br />Liquidated damages shall be deducted from the approved quoted amount, in a sum of <br />$50 dollars per weekday (M-F) for non -completion after June 3rd, 2022. <br />In submitting a quote, the Contractor Warranties the project shall be complete in every <br />way and accepted by the City on or before the first Friday in June of 2022. <br />2 I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.