Laserfiche WebLink
r <br /> l` <br /> F.'. <br /> 3!. <br /> Fi <br /> said improvement. The warranty must be in the form of a Letter of Credit in a form acceptable to <br /> the CITY'S Finance Director or a cash escrow. <br /> r:- <br /> 14. Maintenance Guarantee for Landscaping. It is herein agreed that the PERMITTEE shall provide <br /> the CITY a maintenance guarantee to ensure the survival of the plantings. Said maintenance <br /> guarantee shall consist of cash or a Letter of Credit, approved as to form by the CITY, in the <br /> amount of$21,240. r#plantings (23 6 trees)x cost/ lantin ($3 001tree x 3 0%avera --p ge non <br /> - <br /> survival survival rate, (0 shrubs)x cost/planting$751shrub x 3 0% average non-survival rate],which shall <br /> be in effect for a two-year period commencing on the date of the CITY's acceptance of said <br /> plantings as part of the Required Private Improvements. The CITY shall draw down the <br /> q p <br /> guarantee as required in Paragraph 13 (warranty for Stage I Improvements and Stage It <br /> Improvements)and shall not require a separate guarantee. <br /> 15. Street Cleaninaand Clean UP. After the street surfacing that is a part of the Stage I <br /> Improvements is installed,the PERMITTEE shall clear any soil,earth, or debris from the streets. <br /> From time to time,the CITY may remove accumulations of soil, earth, and debris from the <br /> streets resulting from the construction of the Stage I Improvements. It shall be the <br /> PERMITTEE'S responsibility to pay the costs associated with this necessary street cleaning. <br /> Invoices from the CITY to the PERMITTEE for such costs shall be paid within fifteen(15) days <br /> of the date of the invoice. <br /> 16. Payment of Development Fees. The PERMITTEE must pay to the CITY the fees described on <br /> Exhibit B which may include,but are not limited to, Park Land Dedication Fees, Trail <br /> Development Fees, Sanitary Sewer Connection(Trunk)Fees, water Connection(Trunk)Fees, <br /> Sanitary Sewer Lateral Fees, water Lateral Fees, Storm water Management Fees, Street Light as <br /> well as Street Light operation and Maintenance Fees. Fees must be paid prior to recording of <br /> PLAT. <br /> 17. Requirements for Building Permits and occu anc Permits. <br /> g <br /> 3 <br /> a. No building permit for any lot in the Plat shall be issued until the PERMITTEE has: (a) k <br /> installed a Class 5 driving surface to within 300 feet of the structure and such <br /> construction does not conflict with the construction of Improvements;I Stage Im (b)g p � �^ <br /> provided the Building official with a Certificate of Survey- c.)submitted the financial <br /> guaranty described in Section I I of this Agreement to the CITY; d.) obtained all <br /> necessary permits from regulatory agencies, including the Lower Rum River watershed <br /> Management organization, and has provided a copy of each permit to the CITY; and <br /> b. Construction access across property owned by Anoka County must approved d b <br /> � pprove y <br /> Anoka County under separate agreement; and <br /> c. The City shall approve early permits for three models as outlined in the Final Plat <br /> resolution; and <br /> d. No occupancy permit for any lot in the Plat shall be issued until the PERMITTEE has: <br /> (a) constructed vehicular access to the lot, including the installation of at least one layer <br /> of bituminous surfacing; (b)constructed all utilities and storm water facilities this <br /> Contract requires to serve the lot and such utilities and storm water facilities are in place <br /> and operational and the CITY has accepted those utilities and storm water facilities; (c) . <br /> provided the CITY with a certificate of grading,prepared by a licensed(State of <br /> f3 <br /> Minnesota)professional land surveyor, certifying that the flattest grade on any lots <br /> 5 <br />