My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/24/2022
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2022
>
Agenda - Planning Commission - 03/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:16:04 AM
Creation date
3/18/2022 1:57:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/24/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Design Summary Worksheet UNIVERSITY <br /> lVlinuesole Pollution <br /> OF MiNNESOTA <br /> Control Agency =�. <br /> 4. SOIL TREATMENT AREA DESIGN SUMMARY <br /> Trench Design Summary <br /> Dispersal Area ft, Sidewall Depth in Trench Width ft <br /> Total Lineal Feet ft Number of Trenches Code Maximum Trench Depth in <br /> Contour Loading Rate E==ft Min Trench Length E=ft Designers Max Trench Depth E=in <br /> Bed Design Summary <br /> Absorption Area 1000 ft, Depth of sidewall 0.5 in Code Maximum Bed Depth 16.0 in <br /> Bed Width 16 ft Bed Length==ft Designers Max Bed Depth E=in <br /> Mound Design Summary <br /> Absorption Bed Area ft, Bed Length ft Bed Width ft <br /> Absorption Width ft Clean Sand Lift ft Berm Width (0-1%) ft <br /> Upslope Berm Width ft Downslope Berm Width ft Endslope Berm Width ft <br /> Total System Length E=ft Total System Width E=ft Contour Loading Rate E=gat/ft <br /> At-Grade Design Summary <br /> Absorption Bed Width ft Absorption Bed Length ft System Finished Height ft <br /> Contour Loading Rate gal/ft Upslope Berm Width ft Downslope Berm Width ft <br /> Endslope Berm Width E=ft System Length E:=ft System Width L=ft <br /> Level Et Equal Pressure Distribution Summary <br /> No. of Perforated Laterals Perforation Spacing ft Perforation Diameter 3/16 in <br /> Lateral Diameter 1.50 in Min. Delivered Volume 134 gal Maximum Delivered Volume=150 gal <br /> Non-Level and Unequal Pressure Distribution Summary <br /> Elevation Pipe Volume Pipe Length Perforation Size <br /> (ft) Pipe Size(in) (gat/ft) (ft) (in) Spacing(ft) Spacing(in) <br /> Lateral 1 Minimum Delivered Volume <br /> Lateral 2 gat <br /> Lateral 3 <br /> Lateral 4 Maximum Delivered Volume <br /> Lateral 5 gal <br /> Lateral <br /> 5, Additional Info for At-Risk, HSW or Type IV Design <br /> A. Calculate the organic loading <br /> 1. Organic Loading to Pretreatment Unit =Design Flow X Estimated BOD in mg/L in the effluent X 8.35 a 1,000,000 <br /> gpd X mg/L X 8.35 '. 1,000,000= lbs. BOD/day <br /> 2. Type of Pretreatment Unit Being Installed: <br /> 3. Calculate Soil Treatment System Organic Loading: BOD concentration after pretreatment a Bottom Area =lbs./day/ft2 <br /> mg/L X 8.35 s 1,000,000 ft2= tbs./day/ftz <br /> Comments/Special Design Considerations: <br /> I hereby certify that I have completed this work in rdance with all icable ordinances, rules and laws. <br /> Mark Tradewell 307 02/11/22 <br /> (Designer) (Signature) (License x1 (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.