My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 12/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:20:05 PM
Creation date
3/22/2022 2:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> Mel& <br /> August 6,2021 HGTS Project Number:21-0561 <br /> Ms. Tracey Rust <br /> The Excelsior Group <br /> 1660 Highway 100 South,Suite 400 <br /> St. Louis Park,MN 55416 <br /> Re: Geotechnical Exploration Report, Proposed Trott Brook Property, Residential <br /> Development,West of Nowthen Boulevard NW and North of Trott Brook,Ramsey, <br /> Minnesota <br /> Dear Ms. Rust: <br /> We have completed the geotechnical exploration report for the proposed residential <br /> development in Ramsey,Minnesota. A brief summary of our results and recommendations is <br /> presented below. Specific details regarding our procedures, results and recommendations <br /> follow in the attached geotechnical exploration report. <br /> Twelve(12)soil borings were completed for this project that encountered about 1f oot of sandy <br /> topsoil that was underlain by predominantly sand soils that extended to the termination <br /> depths of the borings. Groundwater was encountered in the soil borings at depths ranging <br /> from about 7 1/2 to 19 1/2 feet below the ground surface and to further evaluate groundwater <br /> levels three piezometers were installed. Water level measurements are on-going and results <br /> will be forwarded as they become available. <br /> The vegetation and topsoil are not suitable for foundation support and will need to be <br /> removed from within the proposed building and oversize areas and replaced with suitable <br /> compacted engineered fill. In our opinion, the underlying native alluvial soils are generally <br /> suitable for foundation support. However, the native sands had a loose relative density and <br /> will need to be surface compacted to increase their density to provide adequate foundation <br /> support. <br /> With the building pad prepared as recommended it is our opinion that the foundation for the <br /> proposed building can be designed for a net allowable soil bearing capacity up to 2,000 pounds <br /> per square foot. <br /> Thank you for the opportunity to assist you on this project. If you have any questions or need <br /> additional information,please contact Paul Gionfriddo at 612-729-2959. <br /> Sincerely, <br /> Haugo GeoTechnical Services <br /> M <br /> Nic Alfonso,G.I.T. Paul Gionfriddo,P.E. <br /> Project Geologist Senior Engineer <br /> 2825 Cedar Avenue S, M eapolis, MN 55407 <br />
The URL can be used to link to this page
Your browser does not support the video tag.