My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 12/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:20:05 PM
Creation date
3/22/2022 2:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br /> Sotarra proposes to develop an approximately 200-acres site referred to as Sotarra- Trott Brook as single <br /> family detached residential homes. The project will consist of 270 single-family homes. For the purposes <br /> of this study, it is anticipated that construction will be complete, and the facilities fully occupied by 2026. <br /> The proposed site is located between Nowthen Boulevard to the east and Variolite Street to the west and is <br /> bordered on the south by Trott Brook, and on the north by an extension of 173' Avenue NW. The site <br /> location is illustrated on Figure 1, "Vicinity Map". Direct access to the site is proposed via two locations, <br /> a new public roadway originating at a new intersection along Variolite Street at approximately 170th <br /> Avenue NW and progressing eastward into the site, and from 173rd Avenue NW at the intersection with <br /> Nowthen Boulevard moving westward into the site. Indirect access is available from 175th Avenue NW, <br /> 167'Avenue NW, Alpine Avenue NW and Ramsey Boulevard via the intersections with Variolite Street <br /> and Nowthen Boulevard. The location of these accesses is illustrated on the Concept Site Plan,Figure 2. <br /> The purpose of this study is to support the EAW completed for the Sotarra Trott Brook development, <br /> particularly to evaluate the impact of traffic generated by the proposed development on the operations and <br /> safety of the adjacent roadway network. The study focuses on the roads and intersections that provide <br /> direct and indirect access into the site. This study details the existing and future roadway conditions at <br /> studied intersections and includes traffic volumes, lane geometrics and traffic operational analysis results. <br /> Recommendations regarding roadway improvements to accommodate site generated traffic, as well as the <br /> anticipated growth in background traffic are included as necessary. <br /> Traffic Impact Study Page 1 Sotarra-Trott Brook <br /> S2 Traffic Solutions August 10,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.