Laserfiche WebLink
B. Anticipated Improvements for No-Build Conditions <br /> There are no programmed improvements identified for the roadways surrounding the site. For the purposes <br /> of this study it is assumed that the current roadway condition will remain as is. <br /> C. Results of Analysis <br /> The study area intersections identified in Section II were analyzed for the 2026 and 2040 No-Build <br /> scenarios. Complete discussion of the results of these analyses is provided in Section IV, where a <br /> comparison with corresponding design year Build alternatives are made. <br /> Traffic Impact Study Page 12 Sotarra-Trott Brook <br /> S2 Traffic Solutions August 10,2021 <br />