Laserfiche WebLink
MINNESOTA POLLUTION <br /> CONTROL OL AGENCY <br /> 520 Lafayette Road North I St.Paul,Minnesota 55155-41 4 1 651-296-6300 <br /> 800-657-3864 1 Use your preferred relay service I info.pca@state.rnn.us I Equal Opportunity ty Employer <br /> October 26, 2021 <br /> Bruce Westby <br /> City Engineer <br /> City of Ramsey <br /> 7550 Sunwood Drive Northwest <br /> Ramsey, MN 55303 <br /> RE: Trott Brook Crossing Environmental Assessment Worksheet <br /> Dear Bruce Westby: <br /> Thank you for the opportunity to review and comment on the Environmental Assessment Worksheet <br /> (EAW)for the Trott Brook Crossing project(Project) in the City of Ramsey,Anoka County, Minnesota. <br /> The Project consists of a new residential development. Regarding matters for which the Minnesota <br /> Pollution Control Agency(MPCA) has regulatory responsibility or other interests, the MPCA staff has the <br /> following comments for your consideration. <br /> Permits and Approvals Required (Item 8) <br /> Although there are less than 2 acres of permanent wetland impacts, Item 8 should still include the MPCA <br /> Clean Water Act Section 401 Water Quality Certification as a required permit. For further information <br /> about the 401 Water Quality Certification process, please contact Jim Brist at 651-757-2245 or <br /> i i m.brist@state.m n.us. <br /> Water Resources(Item 11) <br /> • The EAW indicates that the Stormwater Pollution Prevention Plan (SWPPP)for the Project will be <br /> submitted to MPCA for review and approval prior to obtaining National Pollutant Discharge <br /> Elimination System/State Disposal System (NPDES/SDS) Construction Stormwater Permit(CSW <br /> Permit) coverage due to disturbing more than 50 acres and the ability to discharge to an impaired <br /> water. Due to the water impairment,the SWPPP will need to include the requirement to stabilize <br /> inactively worked soils within 7 days to temporarily or permanently ceasing soil disturbing activity <br /> on any portion of the site. A temporary sediment basin will be required where 5 or more acres of <br /> land drain to a common location. <br /> • The Project must also avoid soil disturbance within 50 feet of existing buffers to wetlands on the site <br /> unless necessary to complete the construction. If the 50 foot buffer must be encroached,then <br /> redundant(double) downgradient sediment controls must be installed to protect these water <br /> bodies.The requirement must be included in the SWPPP for the Project. <br /> • The EAW indicates that infiltration basins will be utilized to reduce stormwater volume for 1 inch of <br /> stormwater runoff. However,the EAW also discusses use of stormwater ponds meeting National <br /> Urban Runoff Program pond requirements which are not recognized by the CSW Permit. It is <br /> important to note that stormwater management should be achieved in upland areas and that no <br /> wetlands on the site maybe be utilized for stormwater runoff without going first going through the <br /> wetland mitigation process. <br />