Laserfiche WebLink
City Staff has worked with Bolton and Menk to put together a phased approach that will ultimately provide a cost <br /> and preliminary design of improvements in the area. Topographical survey and soil borings are needed prior to <br /> putting together a design and cost estimate for the project. A copy of the proposal for the Topographical Survey is <br /> attached to this case. The EDA approved this expenditure at the December 9,2021 Meeting. <br /> Once the Topographical Survey is complete, Bolton and Menk can begin work on the Engineering Services for the <br /> West Armstrong Redevelopment Area. The Proposal for Engineering Services(i.e., feasibility,preliminary design, <br /> plans and specs) for West Armstrong Redevelopment Area is attached to this case and would need City Council <br /> Approval. <br /> Staff is asking for action by the City Council to authorize Engineering Services for West Armstrong <br /> Redevelopment Area(i.e., feasibility,preliminary design,plans and specs)outlined in the Bolton and Menk <br /> proposal. <br /> Notification: <br /> Notification is not required. <br /> Observations/Alternatives: <br /> Observations: <br /> The proposal for Engineering Services for West Armstrong Redevelopment Area(Design/Plans and Specs and <br /> Updated Bunker Lake Blvd Feasibility Study)is $49,835.00. It should be noted that the Topographical Survey <br /> referenced in this proposal has been removed and is included in the $7,955.00 Topographical Survey which was <br /> already approved by the EDA. In this proposal there is also a proposed Feasibility Report Update at the line item <br /> cost of$8,160. Staff has spoken with City Engineer Bruce Westby and this feasibility update could be performed <br /> in-house by the City Engineering team if there is available staff capacity. Staff would ask for flexibility from the the <br /> City Council to fund the entire cost of the study(including the Feasibility Report Update)with the ability to reduce <br /> it if the work can be done internally. <br /> Proposal for Engineering Services for West Armstrong Redevelopment Area(Design/Plans and Specs and <br /> Feasibility Update)-$49,835 <br /> Alternatives: <br /> 1)Adopt Resolution#21-349 Authorizing Funding and Ordering Engineering Services for West Armstrong <br /> Redevelopment Area(Designs/Plans and Feasibility Update) as presented($49,835)(EDA Recommendation) <br /> 2)Adopt Resolution#21-349 Authorizing Funding and Ordering Engineering Services for West Armstrong <br /> Redevelopment Area(Designs/Plans and Specs) excluding the Feasibility Report Update ($41,675) <br /> 3) Something else <br /> Funding Source: <br /> Engineering Services for West Armstrong Redevelopment Area(Designs/Plans and Feasibility Update) <br /> The funding for this action would be the PIR Fund. <br /> Recommendation: <br /> The EDA met on December 9,2021 and passed a unanimous motion to recommend to the City Council to <br /> Authorize the Funding and Order Engineering Services for West Armstrong Redevelopment Area(Designs/Plans <br /> and Feasibility Update)as presented($49,835) <br /> Action: <br />