Laserfiche WebLink
CC Regular Session 5. 16. <br /> Meeting Date: 03/22/2022 <br /> Submitted For: Joe Feriancek, Engineering/Public Works <br /> By: Joe Feriancek, Engineering/Public Works <br /> Information <br /> Title <br /> Adopt Resolution#22-076 Approving Plans and Specifications and Authorizing Advertisements for Bids for 2022 <br /> Crack Seal Improvements, Improvement Project#22-08 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-076 Approving Plans and Specifications and Authorizing <br /> Advertisements for Bids for 2022 Crack Seal Improvements, Improvement Project#22-08. <br /> Background: <br /> Crack seal improvements are completed annually, on between 10 and 23 miles of public street segments to <br /> cost-effectively maximize the life of the bituminous pavement. <br /> Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement and <br /> joints between the pavement and concrete curb and gutter, and utility castings. Reducing future pavement damage <br /> due to wet subgrade soils, especially during freeze-thaw cycles. <br /> The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, and <br /> fourteenth year following construction, reconstruction, and overlay improvements. However,while this is the <br /> typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br /> adjusts the schedule of maintenance operations based on actual pavement conditions. <br /> A total of 10.37 miles of public street segments is proposed to receive crack seal improvements in 2022. These <br /> street segments were selected based on age,pavement maintenance history, and Pavement and Surface Evaluation <br /> Rating(PASER)values of 7 or higher. <br /> Plans and specifications for the 2022 Crack Sealing Improvements were prepared in-house as part of Staff s normal <br /> duties. A copy of the plans is attached to this case. <br /> Preliminary Schedule Remaining <br /> •Council Approves Plans and Specifications/Authorizes Ad for Bids <br /> o March 22, 2022 <br /> • Staff Receives Bids <br /> o April 18, 2022 <br /> •Council Awards Contract to the lowest responsible bidder <br /> o April 26, 2022 <br /> •Contractor begins construction <br /> o June 2022 <br /> •Contractor Completes Improvements <br /> o July 29, 2022 <br /> Notification: <br />