My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 03/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:27:31 PM
Creation date
3/23/2022 10:56:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
765
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIS OF PAYMENT: <br /> Mobilization—Payment shall be made on a lump sum basis for the mobilization of equipment. <br /> 6"Ductile Iron Pipe Class 53 Watermain — Payment shall be made on a per lineal foot basis as <br /> compensation for all equipment, material, and labor costs required for the installation of DIP <br /> watermain. Excavation for watermain is incidental to the DIP Watermain pay item. <br /> Ductile Iron Fittings — Payment shall be made on a lump sum basis as compensation for all <br /> equipment, material, and labor costs required for the installation of ductile iron fittings, including <br /> but not limited to all bends, restraints, caps. <br /> Bituminous and Concrete Removal—Payment shall be made on a lump sum basis as compensation <br /> for all equipment, material, and labor costs required for the removal of bituminous pavement, <br /> concrete walk, and concrete curb and gutter. All removals shall be saw-cut. <br /> Aggregate Base Class 5 Temporary Patch — Payment shall be made on a lump sum basis as <br /> compensation for all equipment, material, and labor costs required for the loading, transportation, <br /> placement, and compaction of aggregate base meeting the Class 5 Ramsey gradation requirements. <br /> Temporary patch shall be a minimum thickness of 10 inches. <br /> Indoor Concrete Remove and Replace — Payment shall be made on a lump sum basis as <br /> compensation for all equipment,material,and labor costs required for the removal and replacement <br /> of concrete floor. Replacement material shall match the existing floor thickness and appearance. <br /> All removals shall be saw-cut. Concrete floor impact area shall be minimized to the extent <br /> practical. <br /> Restoration — Payment shall be made on a lump sum basis as compensation for restoring the <br /> excavation area with a minimum of 4" topsoil, seed, fertilizer, and hydro-mulch. Seed mix shall <br /> meet MnDOT seed mixture 25-151. <br /> Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br /> have not been specifically identified in this section for payment, but are required to complete the <br /> project per the plans and specifications shall be considered incidental to the project. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.