BASIS OF PAYMENT: <br /> Mobilization—Payment shall be made on a lump sum basis for the mobilization of equipment. <br /> 6"Ductile Iron Pipe Class 53 Watermain — Payment shall be made on a per lineal foot basis as <br /> compensation for all equipment, material, and labor costs required for the installation of DIP <br /> watermain. Excavation for watermain is incidental to the DIP Watermain pay item. <br /> Ductile Iron Fittings — Payment shall be made on a lump sum basis as compensation for all <br /> equipment, material, and labor costs required for the installation of ductile iron fittings, including <br /> but not limited to all bends, restraints, caps. <br /> Bituminous and Concrete Removal—Payment shall be made on a lump sum basis as compensation <br /> for all equipment, material, and labor costs required for the removal of bituminous pavement, <br /> concrete walk, and concrete curb and gutter. All removals shall be saw-cut. <br /> Aggregate Base Class 5 Temporary Patch — Payment shall be made on a lump sum basis as <br /> compensation for all equipment, material, and labor costs required for the loading, transportation, <br /> placement, and compaction of aggregate base meeting the Class 5 Ramsey gradation requirements. <br /> Temporary patch shall be a minimum thickness of 10 inches. <br /> Indoor Concrete Remove and Replace — Payment shall be made on a lump sum basis as <br /> compensation for all equipment,material,and labor costs required for the removal and replacement <br /> of concrete floor. Replacement material shall match the existing floor thickness and appearance. <br /> All removals shall be saw-cut. Concrete floor impact area shall be minimized to the extent <br /> practical. <br /> Restoration — Payment shall be made on a lump sum basis as compensation for restoring the <br /> excavation area with a minimum of 4" topsoil, seed, fertilizer, and hydro-mulch. Seed mix shall <br /> meet MnDOT seed mixture 25-151. <br /> Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br /> have not been specifically identified in this section for payment, but are required to complete the <br /> project per the plans and specifications shall be considered incidental to the project. <br /> 4 <br />