My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 03/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:27:31 PM
Creation date
3/23/2022 10:56:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
765
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7. 6. <br /> Meeting Date: 03/22/2022 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title: <br /> Adopt Resolution#22-072 Accepting Bids and Awarding Contract for Improvement Project#22-05, Riverdale <br /> Drive Trunk Utility Improvements, Llama Street to Bowers Drive <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-072 accepting bids and awarding a contract for construction for <br /> Improvement Project#22-05, Riverdale Drive Trunk Utility Improvements, Llama Street to Bowers Drive, and <br /> approving a proposal from Bolton and Menk, Inc. to provide construction related services. <br /> Background: <br /> The extension of Riverdale Drive between Llama Street and Bowers Drive is needed to support development in the <br /> area. In the Spring of 2022, Capstone Homes plans to begin construction on the first phase of Riverstone South, a <br /> 244-unit residential development east of Bowers Drive and south of U.S. Highway 10/169. Commercial <br /> development is also proposed in the area between U.S. Highway 10/169 and the proposed extension of Riverdale <br /> Drive. These developers will pay trunk utility fees when they develop to help replenish trunk utility funds used to <br /> pay for these trunk utility improvements. <br /> Improvement Project#22-05 proposes to construct the trunk municipal utilities (sanitary sewer and watermain) <br /> along the proposed extension of Riverdale Drive NW between Llama Street NW and Bowers Drive, along with the <br /> required storm sewer improvements. As discussed previously,the trunk utility improvements are proposed to be <br /> constructed ahead of the street improvements project(Improvement Project#20-05)to better facilitate the proposed <br /> construction schedule for Riverstone South. The trunk utility plans did not need to follow the same MnDOT LPP <br /> plan review process as the street improvement plans, allowing the utility improvements to be bid and constructed <br /> earlier thereby minimizing the construction schedule for Improvement Project#20-05. <br /> Construction for this work would previously have been estimated to take about 8 weeks to complete, including the <br /> lift station within the Riverstone South plat. However, construction for this project is now anticipated to take <br /> considerably longer with construction anticipated to start in April or May and to be complete by August 2022. The <br /> actual project schedule will depend on weather, availability of materials, and the awarded contractor's availability. <br /> Contractor's typically order their materials upon execution of a contract,but recently the delivery of construction <br /> materials to job sites, especially utility pipes and appurtenances,has been taking several months after materials are <br /> ordered. The current anticipated delivery time for watermain materials after they are ordered is up to 20 weeks. <br /> Staff will work to properly coordinate this trunk utility work with the private utilities work occurring as part of the <br /> Riverstone South development. <br /> Notification: <br /> Advertisements for bids were published in the Anoka Union Herald and in Finance& Commerce on February 11 <br /> and 18, 2022. <br /> This project was also advertised and bid electronically through QuestCDN. Bolton and Menk administered bids <br /> with some assistance from Staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.