My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/06/2005
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2005
>
Agenda - Planning Commission - 10/06/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:38:02 AM
Creation date
9/30/2005 11:48:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/06/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Associate Planner Wald stated the sketch plan is providing several different types of residential <br />unit styles throughout the development. The unit types include small lot single hmily, with 66- <br />foot wide lots, court homes, row house townhomes, and apartment facilities. <br /> <br />Associate Planner Wald reviewed that approximately 98 acres of the total 190 acre site is <br />proposing to be developed with residential units for a net density of approximately 8.0 units per <br />acre. She indicated Staff will need to determine density over the entire plat as part of the <br />preliminary plat process. <br /> <br />Associate Planner Wald explained the concept plan is providing a major north/south street <br />connection through the development to Alpine Drive. The proposed road alignment with County <br />Road 116 to the east is desirable. She stated Staff would suggest that the developer continue to <br />look at how to provide a stronger east/west connection throughout the development. She <br />indicated the subdivision is subject to an Environmental Assessment Worksheet which will <br />address in great detail transportation, water quality, and any environmental issues. The EAW has <br />been initiated and it is anticipated that during preliminary plat review baseline information <br />completed for the EAW will be available. She indicated the sketch, plan is showing how the <br />exception piece could be developed and integrated into the project area. <br /> <br />Associate Planner Wald advised the City Council recently initiated a master planning study for <br />the area located west of Town Center, which includes the Pulte property. She stated the City <br />retained the services of a team of architects to complete the master planning study in a timely <br />manner. She indicated Staff has met several times with the master planning architects to work <br />through some preliminary concept plans specifically related to the Pulte property. <br /> <br />Associate Planner Watd explained the sketch plan process is intended to provide the developer <br />with general feedback and direction regarding a proposed subdivision. She stated that upon <br />receiving feedback from the Planning Commission and City Council, it is up to the developer to <br />decide when to proceed to preliminary plat and how to incorporate received feedback. She <br />indicated the applicant is requesting to discuss their proposed concept plan and solicit feedback <br />t¥om the Planning Commission. <br /> <br />Public Input ' <br /> <br />Cory, Leper indicated he has been working with Staff. for six to eight months, trying to determine <br />how they could provide a nice community. He stated they have strong traffic connections and <br />four pods of homes. He indicated they spent a lot of time with Staff and their planners to <br />develop a master plan. He stated the desire is to create nodes with open space around them, with <br />connections to the east to the Town Center and to the west to the Regional Park. <br /> <br />Chairperson Nixt asked about the current zoning. He stated it appears the single-family area in <br />the center is currently zoned R-3 and R-2. He indicated the only portion of the development area <br />zoned .R-1 is the northwest corner. He asked what the thought process is bringing single-family <br />into the center. <br /> <br />146 <br /> <br />Planning Commission/March 10, 2005 <br /> 'Page 2 of 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.