My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 04/12/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:28:11 PM
Creation date
4/14/2022 1:44:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 13. <br /> Meeting Date: 04/12/2022 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title <br /> Adopt Resolution#22-087 Approving Change Order#1 for Improvement Project#22-05, Riverdale Drive Trunk <br /> Utility Improvements, Llama Street to Bowers Drive <br /> Purpose/Background: <br /> Purpose <br /> The purpose of this case is to adopt Resolution#22-087 approving Change Order#1 for Improvement Project <br /> #22-05, Riverdale Drive Trunk Utility Improvements, Llama Street to Bowers Drive. <br /> Background: <br /> The extension of Riverdale Drive between Llama Street and Bowers Drive is needed to support development in the <br /> area. In March of 2022, Capstone Homes began construction on the first phase of Riverstone South, a residential <br /> development(244-units at full build out) east of Bowers Drive and south of U.S. Highway 10/169. Commercial <br /> development is also proposed on the land between U.S. Highway 10/169 and the proposed extension of Riverdale <br /> Drive. The developers will pay trunk utility fees as they develop to replenish the trunk utility funds used to pay for <br /> the trunk sanitary sewer and watermain improvements. <br /> Improvement Project#22-05 proposes to construct the trunk sanitary sewer and watermain improvements along the <br /> proposed extension of Riverdale Drive NW between Llama Street NW and Bowers Drive, along with required <br /> storm sewer improvements. The trunk utility improvements are proposed to be constructed ahead of the street <br /> improvements project(Improvement Project#20-05)to better facilitate the proposed construction schedule for <br /> Riverstone South since the trunk utility plans did not need to follow the same plan review process at the Minnesota <br /> Department of Transportation(MnDOT) as the street improvement plans. This allowed the utility improvements to <br /> be bid and constructed months earlier, minimizing the construction schedule for Improvement Project#20-05. <br /> Prior to publishing advertisements for bids for Improvement Project#22-05, construction was anticipated to take <br /> two months, including the lift station within the Riverstone South plat. However, as Staff discussed with Council on <br /> March 22nd when the contract for construction was awarded to Douglas-Kerr Underground, construction was <br /> anticipated to take considerably longer due to limited availability of some construction materials,most notably <br /> ductile iron pipe (DIP)watermain. At that time, DIP was taking up to 20 weeks to be delivered to project sites so <br /> Staff was anticipating a project completion date near the end of August assuming a start date around May 1 st. <br /> Since March 22nd, contractors such as Douglas-Kerr Underground received letters from DIP suppliers stating that <br /> delivery of DIP to projects will take 26 weeks or more now due to the global supply chain disruptions and the <br /> conflict between Russia and Ukraine. Attached are copies of these letters. This would result in a construction <br /> completion date in late September or early October. Since Improvement Project#20-05 cannot start until <br /> Improvement Project#22-05 is generally complete, this could result in cold weather paving or delaying paving <br /> operations until 2023. <br /> Bolton and Menk,the City's design engineer,worked with Douglas Kerr Underground and MnDOT to prepare the <br /> attached Change Order#1 that,upon Council approval, will authorize Douglas Kerr Underground to install plastic <br /> C900 watermain in lieu of DIP for all 8-inch and 12-inch trunk watermain on this project. <br /> City Staff approves of Change Order#1 as plastic trunk watermain has been constructed recently in several <br />
The URL can be used to link to this page
Your browser does not support the video tag.