My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 04/12/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:28:11 PM
Creation date
4/14/2022 1:44:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M.: STATE AID FOR LOCAL TRANSPORTATION Rev. February 2018 <br /> oMcNTof CHANGE ORDER <br /> Tf7ANSP�NSPpRTAl10N <br /> SAP 199-115-004 MN Project No.: I NA Change Order No. 1 <br /> Project 2022 Riverdale Drive Trunk Utility Improvements <br /> ---- <br /> L I A enc Local Project No. 22-05 <br /> oca g y City of Ramsey J <br /> Contractor Douglas-Kerr Underground LLC <br /> Address/City/State/Zip 2142 330t" Avenue, Mora, MN 55051 <br /> ------------- ------------- <br /> Total Change Order Amount $ (41 5952-50) <br /> The 2022 Riverdale Drive Trunk Utility Improvements project is required to provide public utility service to the <br /> Riverstone South development. <br /> The project was designed, and bids were opened on March 11 , 2022, with 11 bids being received. The project <br /> was awarded to the low bidder, Douglas-Kerr Underground LLC. <br /> Due to supply shortages of raw materials associated with the manufacturing of ductile iron pipe, product <br /> availability has become an issue within the industry. The issue has become more pronounced over the past <br /> several weeks as demonstrated by the attached notices from AMERICAN Ductile Iron Pipe and U.S. Pipe. The <br /> notices are attached for reference. <br /> Douglas-Kerr Underground LLC, along with the other 10 bidders had included pricing for ductile iron pipe in <br /> their bids. None of the 11 contractors had indicated during the bidding process that ductile iron pipe would be <br /> an issue to obtain. A review of the bids received indicates consistent unit pricing for ductile iron pipe from the <br /> bidders. This further validates the recent nature of the extreme supply issue being experienced in the industry. <br /> PVC C900 pipe is also being used widely within the industry for watermain installations. Douglas-Kerr <br /> Underground LLC has provided pricing for the use of PVC C900 pipe on the 2022 Riverdale Drive Trunk Utility <br /> Improvements project in lieu of ductile iron pipe. The following table depicts additions and deletions from the <br /> contract as a result of the change from ductile iron pipe to PVC C900 pipe. Fire hydrants and fire hydrant leads <br /> will remain as ductile iron products due to availability for the limited quantity of each required for the project. <br /> Estimate Of (Include any r r r decreases contractitems, any negotiatedor force accountr <br /> Item + or— + or— <br /> No. y <br /> Description Unit Unit Price Quantity Amount $ <br /> 43 8" WATERMAIN DUCTILE IRON CL 52 LIN FT $59.25 (900) ($53,325.00) <br /> 44 12" WATERMAIN DUCTILE IRON CL 52 LIN FT $81.45 (3.950) ($3213727.50) <br /> C01 - 1 8" PVC WATERMAIN LIN FT $50.60 900 $45,540.00 <br /> C01 - 2 12" PVC WATERMAIN LIN FT $72.80 3,950 $2875560.00 <br /> Net Change this Change Order ($415952.50) <br /> _ to this change, (check <br /> (X ) Is NOT changed ( ) May be revised as provided in MnDOT Specification 1806 <br /> SIGNATURES NEXT PAGE <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.