• Preliminary design complete <br />• Final design underway and property acquisitions in progress <br />• Construction anticipated late 2023 through early 2026 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />o Requested by Minnesota DNR <br />o Staff is preparing plans <br />o Construction proposed for 2023 <br />City of Anoka Improvement Projects <br />. Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Webpage @ https://clients.bolton-menk.com/anokahwy47/ <br />• Updates on temporary signal system at McKinley Street will be discussed as a separate case <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share $150,000 each (per $1.5M est.) <br />• Anoka County/WSB preparing plans <br />• Construction proposed for 2023, pending City & County approvals <br />• Council will consider approving JPA in April/May 2022 <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />• Construction underway with completion proposed in Spring 2024 <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction underway with completion proposed in Spring 2024 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 or later <br />• Rum River Bridge Replacement <br />• Construction underway with completion proposed in Spring 2024 <br />• Proposing three lanes each direction between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• 5805 148th Lane NW <br />• No updates at this time. Property owners like everything as is. <br />• FYA Improvements at Sunwood Drive and Ramsey Boulevard <br />• Staff will inform Anoka County that the City does not want to construct FYA improvements following <br />Council approval of the March PWC minutes. <br />• Elk River Highway 10 Corridor Study <br />• Update anticipated May 2022 <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />