My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/10/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 05/10/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:30:25 PM
Creation date
5/10/2022 11:46:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/10/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT Contract No: 07023 <br /> STATE of MINNESOTA <br /> DEPARTMENT OF TRANSPORTATION <br /> And <br /> CITY of RAMSEY <br /> And <br /> ANOKA COUNTY <br /> TRAFFIC CONTROL SIGNAL <br /> MAINTENANCE A GRE El MEN ` <br /> Control Section C,S. : -95 <br /> Trunk Highway dumber T. . : 10= 003. <br /> Signal System ID's System "A"=39839 <br /> System "B" (No 1.D. <br /> System "C"(No I.D. <br /> This Agreement is between the State of Minnesota,acting through its Commissioner of Transportation("State"), City <br /> of Ramsey acting through its City Council("City"), and Anoka County acting through its Board of Commissioners <br /> ("County"). <br /> Recitals <br /> l. The City,County and State have found it in the best interest of the Public to remove the existing Traffic <br /> Control Signal on'Trunk Highway No. 10 at County State Aid Highway No. (Armstrong Boulevard) and <br /> install a new Traffic Control Signal including an Emergency Vehicle Pre-emption System on Trunk Highway <br /> No. 10 at County State Aid Highway No. 83 (Armstrong Boulevard)North Ramps and revise the existing <br /> Traffic Control Signal including an Emergency Vehicle Pre-emption System on County State Aid Highway <br /> No. (Armstrong Boulevard)at Sunwood Drive l 'Avenue NW, in the City of Rainse r,Anoka a County, <br /> Minnesota;and <br /> 2. The County and the State will install the components for a future Traffic Control Signal on Trunk <br /> Highway No. 10 at County State,Aid ighway No. Armstrong Boulevard)South Ramps(Systems "C") in <br /> the City of Ramsey,Anoka County,Minnesota; and <br /> . The City, County and Mate wish to define their respective power,operation, and maintenance responsibilities <br /> for the new'Traffic Control Signal "Signal System" in luding an Emergency Vehicle Pre-emption System <br /> "'EVE' System" on Trunk Highway No. 10 at County Mate Aid Highway No. Armstrong Boulevard) <br /> North Ramps (System"A");for the Revised Traffic Control Signal including an Emergency Vehicle Pre- <br /> emption System on County Mate Aid Highway No. 83 (Armstrong Boulevard) Sunwood riv "' <br /> Avenue NW(System" "); and for the components for a future Traffic Control S igtral on Trunk Highway <br /> No. 10 at County Mate Aid Highway No. 83 (Armstrong Boulevard)South Ramps (System"C" in the City <br /> f Ramsey,Ailoka County, Minnesota;nesota; rid <br /> . The St t 's operation and maintenance responsibilities covered under this Agreement will be performed by the <br /> County on a reimbursable basis with the State; and <br /> S. Agreement No. 04854 between the Mate and County will address cost participation; and <br /> . Minnesota Statutes § l l.20, subdivision authorizes the Commissioner of Transportation to make <br /> atTang ments with and cooperate with any goverinnnental authority for the purposes of constructing, <br /> maintaining and improving the trunk highway system. <br /> RG <br />
The URL can be used to link to this page
Your browser does not support the video tag.