My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/17/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 05/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:37:18 AM
Creation date
5/13/2022 8:28:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATHLETIC <br />CONSTRUCTION <br />April 1, 2022 <br />City of Ramsey <br />7550 Sunwood Dr NW <br />Ramsey, MN 55303 <br />Serving Minnesota, Wisconsin, Iowa, <br />Nebraska, North Dakota, and South Dakota <br />3017 161' Ave NW, Andover, MN 55304 <br />763-753-1127 — Phone <br />763-753-3619 — Fax <br />eric @umathleticconstruction.com <br />MN Contractors No. IR722325 <br />I.A Contractors No. C090307 <br />Re: Fox Park Tennis Court <br />17150 Potassium St <br />We propose the following: <br />Tennis Court Color Coat System <br />1. Power wash surface to remove loose paint, vegetation, dirt and debris — dispose of off site <br />2. Machine rout all existing cracks and clean with compressed air — Approx. 500 LF <br />3. Fill with crack patch binder to level of existing surface with multiple applications and grind smooth <br />4. Apply two coats of sand filled acrylic emulsion resurfacer <br />a. 8-10 lbs. silica sand added per gallon of concentrate material <br />b. Coverage:.05-.07 gallons per square yard per coat <br />5. Apply two coats of latex acrylic paint <br />a. Color to be selected by owner <br />b. 6 lbs. silica sand added per gallon of concentrate material <br />c. Coverage: .05 gallons per square yard per coat <br />6. Reline per USTA standards <br />Base Bid $7,500 <br />Alternate 1— Armor Crack Repair System <br />All specifications above will remain the same and these will be added after step #4 in the base bid <br />1. Furnish and install Armor Crack Repair System to all prepared cracks — Approx. 500 LF <br />2. Apply a black acrylic resurfacer blending coat over entire Armor surface according to manufacturer's specifications <br />a. All cracks shall be covered and masked by the filler coat <br />3. Proceed to step #5 in base bid ADD $11,500 <br />Alternate 2 — Net Posts and Tie Down Anchors <br />1. Remove net posts, tie downs, concrete footings and dispose of off site <br />2. Furnish and install one (1) new set of DTP-37 net posts and 1-5/8" tie downs <br />a. 4000PSI concrete net posts 18"x60" and tie downs 12"x36" <br />ADD $2,500 <br />Notes: <br />Standard 1-year material and workmanship warranty <br />No warranty provided on standard crack repairs from reappearing due to our climate and bituminous movement <br />Court is unplayable with acrylic paint peeling off and vegetation growing creating a tripping hazard and should be resurfaced in 2022 <br />Thank you, <br />Eric Hicks <br />Upper Midwest Athletic Construction, Inc. <br />MEMEI:12 <br />SIZE: <br />miiiiflli iii <br />AMI.RICAN <br />/ SRTSNM.S ID R <br />ASSOCIATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.