My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/17/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 05/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:37:18 AM
Creation date
5/13/2022 8:28:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• First bids rejected <br />• Revising plans to minimize project costs without sacrificing quality <br />• Re -bid revised plans Fall 2022 <br />• October 2023 completion deadline <br />• Centralized Water Treatment Plant (#21-09) <br />• AE2S is preparing plans and handling construction administration <br />• 60-percent plans complete (Staff/AE2S providing updates at meeting) <br />• Project completion anticipated Winter 2024 (before water use increases) <br />• Fire Station No. 1 Parking Lot Improvements (#21-10) <br />• Construction in progress <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design and property acquisitions in progress <br />• Construction anticipated late 2023 through early 2026 (2024/25 majority) <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />o Requested by Minnesota DNR <br />o Staff is preparing plans <br />o Construction proposed for 2023 <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwv47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />• Anoka County received $1.35M in HSIP funds (est. project cost $1.5M) <br />• Anoka County and City estimated cost shares were $150,000 (per $1.5M) <br />• Construction proposed for 2023 pending City & County approvals <br />• City Council will consider approving JPA May 24, 2022 <br />• JPA City cost share = $40,512 ($109,488 < original estimate) <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />o Construction underway with completion proposed in Spring 2024 <br />o Temporary signal system at McKinley Street is operational <br />o Anoka webpage https://clients.bolton-menk.com/hwy10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Construction underway with completion proposed in Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwv10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore s-curve realignment <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 (or later) <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Construction underway with completion proposed in Spring 2024 <br />• Proposing three lanes each direction between Highway 47 and 7th Street <br />• MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwv10-anoka/ <br />Studies & Items of Interest <br />• 5805 148th Lane NW <br />
The URL can be used to link to this page
Your browser does not support the video tag.